background image

                                                                                                                                

 

 

 

 

Installation Manual

 

10° tilt leg kit

 

          

[email protected]            1-800-819-7236 Ext 556

 

 

     Page 5 

 

       Step 4.  Attach front and rear legs to the U-foot

 

 

A.

 

With the channel open side facing the front (south) loosely assemble the front and rear legs to the 

U-foot. (the short leg in front and the long leg on the rear) the flange nuts to be on the inside as 

shown.

 

 
 
 
 
 
 
 
 
 
 
 
 
 

    Step 5. Set front and rear leg angle 

 

A.

 

Cut a template from a stiff material to set the angle of the front leg to the mounting surface.

 

B.

 

Adjust the front leg up or down for leveling with adjacent legs and set the angle of the front leg,    

torque bolts to 12ft lbs.

 

C.

 

Repeat with the rear leg.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for UNI-TL10

Page 1: ...Installation Manual 10 tilt leg kit Installation Manual UNI TL10 Manual V1 0 For Uni TL 10 Tilt Kit ...

Page 2: ...Warranty Information 7 Introduction The Tilt Leg Kit is a simple and universal rail mounting solution for adding a tilt to a roof or ground installation using the Tamarack solar 1 6 or 2 3 rails Customer Support Tamarack Solar makes every effort to ensure your mounting kit is easy to install If you need assistance at any point in your installation or have suggestions on how we can improve your exp...

Page 3: ...omponents List ITEM PART NUMBER DESCRIPTION QTY 1 51 0510 000 CHANNEL 10 5 REAR LEG 1 2 51 0503 000 CHANNEL 3 5 FRONT LEG 1 3 51 6000 003 U Foot Ground Mounts 2 4 89570 Mount Adapter 2 5 23 3118 021 Bolt 5 16 18 x 3 4 SST 4 6 25 3102 000 Washer flat 5 16 SS 4 7 25 2501 015 Nut flange 5 16 SST 4 ...

Page 4: ...Installation Manual 10 tilt leg kit support tamaracksolar com 1 800 819 7236 Ext 556 Page 3 Structural Components Views RAIL MOUNT ADAPTER U FOOT 3 5 FRONT LEG CHANNEL 10 5 REAR LEG CHANNEL ...

Page 5: ...g is a general location and angle reference guideline C HOLE CENTERS sets A B dimensions Step 2 Determinefootspacingsidetoside A Spacing is determined by site loading conditions and maximum rail spans for the 1 6 or 2 3 rails and the quantity of panels being installed Step 3 Install the u feet The U foot can be bolted to uni strut standoffs 3 8 J bolts in piers or lagged to wooden structures U fee...

Page 6: ...t and rear legs to the U foot the short leg in front and the long leg on the rear the flange nuts to be on the inside as shown Step 5 Set front and rear leg angle A Cut a template from a stiff material to set the angle of the front leg to the mounting surface B Adjust the front leg up or down for leveling with adjacent legs and set the angle of the front leg torque bolts to 12ft lbs C Repeat with ...

Page 7: ...dapter as shown B Lay the rails on top of the adapters as shown C Torque the adapter bolts to 12Ft Lbs making sure the locking tabs are fully engaged Step 7 Install Solar panels A Lay the first panel centered across the rails and attach the outer edge with the Channel end clamps B Insert the 5050 clamps into the rail and slide up to the first panel C Lay in the next panel slide up to the 5050 clam...

Page 8: ...ions in corrosive atmospheric conditions are excluded The Finish Warranty is VOID if the practices specified by AAMA 609 610 02 Cleaning and Maintenance for Architecturally Finished Aluminum www aamanet org are not followed by Purchaser for Tamarack Solar s aluminum based products The warranty covers the replacement cost of parts to repair the product to proper working condition Transportation and...

Reviews: