Installation Manual
10° tilt leg kit
[email protected] 1-800-819-7236 Ext 556
Page 4
Step 1. Determine foot spacing front to rear
A.
The top down clamping areas on panels generally need to correspond with their mounting hole
locations. The following is a general location and angle reference guideline.
“C” (HOLE CENTERS) sets “A” & “B” dimensions.
Step 2.
Determine foot spacing side to side
A.
Spacing is determined by site loading conditions and maximum rail spans for the 1.6 or 2.3 rails
and the quantity of panels being installed.
Step 3. Install the u-feet
The U-foot can be bolted to uni-strut, standoffs, 3/8 J-bolts in piers, or lagged to wooden
structures. U-feet must be kept in line with each other (east\west)