25
MAN 9054233 EN V4
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: +45 7021 2626
DK-6600 Vejen
E-mail: [email protected]
Step 12:
Now connect the support bar to the clevis bolt, in reverse order as described in Step
9.
After adjusting the shield for the mower, tighten all bolts, according to the tightening
table in the maintenance section.
Step 13:
Connect the front guard for the mower:
1.
Front guard
2.
Bolt M10x25
3.
Washer M10