PRODUCT SPECIFICATION

名称

:

Installation manual for crystalline

solar photovoltaic modules(Half Cell)

SPEC.NO.

TS-ET-xx

REVISION

A0

EFFECTIVE DATE

03-2020

Page

8

of

27

Suzhou Talesun Solar Technologies Co., Ltd

Address: No. 1 Talesun Road, Changkun Industrial Park, Shajiabang Town, Changshu, Suzhou, Jiangsu Province, 215542, P.R.China

Website:

www.talesun.com

Email:

[email protected]

Tel: +86 400 885 1098

8 / 28

this installation, additional mounting points should be used. System designer and installer are responsible for load
calculations and for proper design of support structure.

Use appropriate corrosion-proof fastening materials. All mounting hardware (bolt/split washer/flat washer/nut)
should be stainless steel M8 size. And the parts in contact with the frame should use the plain washer with a diameter
of 20-24mm and a thickness of ≥1.8mm. For the large cavity of the 72-type 35 frame, the plain washer with a diameter
of 16mm should be used.

Follow mounting guidelines recommended by the PV mounting supplier. The mounting design must be certified by a
registered professional engineer.

The mounting design and procedures shall comply with local codes and all authorities having jurisdiction.

Use a torque wrench for installation. Tightening torques should be within 10~17 Nm for M8 coarse thread bolts,
depending on bolt quality class.

Summary of Contents for TP6L60M-320

Page 1: ...ebsite www talesun com Email sales talesun com Tel 86 400 885 1098 REVISIONS Suzhou Talesun Solar Technologies Co Ltd REV ECN NPA DESCRIPTION OF CHANGE CHK D DATE APP D DATE TITLE Installation manual...

Page 2: ...of 27 Suzhou Talesun Solar Technologies Co Ltd Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email sales...

Page 3: ...28 INDEX 1 INTRODUCTION 1 1 PURPOSE OF THE MANUAL 1 2 DISCLAIMER OF LIABILITY 1 3 PRODUCTION IDENTIFICATION 2 SAFETY GUIDELINES 2 1 GENERAL SAFETY GULDELINES 2 2 PRODUCT PRECAUTION 2 3 TRANSPORT AND S...

Page 4: ...eaning This manual and the instructions set forth herein are part of the product and should therefore be kept for the entire useful life of the solar installation Information for operators Keep these...

Page 5: ...TY GUIDELINES DANGER Danger due to electric shock All installations must be performed in compliance with all applicable regional and local codes or other national or international electrical standards...

Page 6: ...for use in this application class may be used in systems operating at greater than 50V DC or 240W where general contact access is anticipated Modules qualified for safety through this part of IEC6173...

Page 7: ...nti salt function when the distance is between 100m and 1km A module is considered shade free when it is entirely unshaded throughout the year e g by buildings chimneys trees Even partial shading of t...

Page 8: ...mended standoff height is 10cm Clearance of 1 4 of an inch 6 35 mm or more between modules is required to allow for thermal expansion of the frames For roof mounting applications the assembly is to be...

Page 9: ...ture Use appropriate corrosion proof fastening materials All mounting hardware bolt split washer flat washer nut should be stainless steel M8 size And the parts in contact with the frame should use th...

Page 10: ...not mounted following the instructions above b Clamping installation Modules can be installed with clamps Modules must be securely attached to the mounting structure with four clamps on the long fram...

Page 11: ...pe Module Dimension Length Width Thickness Load A Distance from module edge to clamping zone B Clamping zone TP6L72 H series 2098mm 1046mm 35mm Negative 1600Pa 440mm 100mm Positive 3600Pa 440mm 100mm...

Page 12: ...r need to pay more attention to avoid the PID phenomenon when installing the electrical system 4 3 GENERAL INSTALLATION Before installing modules contact the appropriate authorities to determine permi...

Page 13: ...oid the PID phenomenon of the module in addition and professional person is needed to undertake the polarity negative ground operation of the inverter If the support frame is made of metal the surface...

Page 14: ...1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 13 28 frame The recommende...

Page 15: ...VISION A0 EFFECTIVE DATE 03 2020 Page 14 of 27 Suzhou Talesun Solar Technologies Co Ltd Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R C...

Page 16: ...exchange is made by an authorized person Protect yourself from electric shocks while debugging or maintaining the solar power system Bypass diode type Manufacturer Schottky GF2545MG Shandong DIYI Sci...

Page 17: ...s Type 6inch 3inch 144cells Mono crystalline 6inch 3inch 120cells Mono crystalline Dimension mm 2098 1046 35 1758 1046 35 Weight kg 25 5 21 Module Maximum System Voltage V Pmax W Vmpp V Impp A Voc V I...

Page 18: ...ng A TP6L60M 375 1000 IEC 375 35 2 10 66 41 3 11 31 20 TP6L60M 370 1000 IEC 370 34 9 10 61 41 1 11 26 TP6L60M 365 1000 IEC 365 34 6 10 56 40 9 11 20 TP6L60M 360 1000 IEC 360 34 3 10 50 40 7 11 15 TP6L...

Page 19: ...oltage V Pmax W Vmpp V Impp A Voc V Isc A Fuse Rating A TP6L60M H 375 1500 IEC 375 35 2 10 66 41 3 11 31 20 TP6L60M H 370 1500 IEC 370 34 9 10 61 41 1 11 26 TP6L60M H 365 1500 IEC 365 34 6 10 56 40 9...

Page 20: ...Tokyo Japan 105 0001 Email japan talesun com Web www talesun com jp T 03 5733 3498 F 03 34341515 USA 25 METRO DRIVE Suite 228 San Jose CA 95 110 USA Email sales talesun com Tel 408 638 7627 Fax 408 64...

Page 21: ...age 20 of 27 Suzhou Talesun Solar Technologies Co Ltd Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email...

Reviews: