background image

    

INSTALLATION  MANUAL FOR CRYSTALLINE SOLAR PHOTOVOLTAIC MODULES 

     

Version: A2         Effective Date: May 13, 2015 

 

ZHONGLI TALESUN SOLAR COMPANY LIMITED 

Address: No. 1 Talesun Road, Changkun Industrial Park, Shajiabang Town, Changshu, Suzhou, Jiangsu Province, 215542, P.R.China 

Website: 

www.talesun.com

    Email: 

[email protected]      

 Tel: +86 400 885 1098 

2 / 19 

 

1

 

INTRODUCTION 

 

1.1

 

PURPOSE OF THE MANUAL 

This guide contains information on precautions to be used during the handling and installation of Talesun Solar Co., Ltd 
photovoltaic modules along with technical instructions to be followed during installation, mounting, wiring and main-
tenance thereof. Talesun Solar Co., Ltd hereafter is referred to as “Talesun”. Any divergence from the contents of this 
manual during the handling, installation, or maintenance of Talesun’s products will render the warranty and any guarantees 
there under null and void. 
 
Information for installers 

 

Installers must read and understand this manual before installation.  

 

Please ensure that installation, operation and maintenance of your photovoltaic system is only carried out by qualified 
persons able to carry out the technical procedures described in this manual, i.e. system planers, installers and 
maintenance personnel, and is carried out in accordance with all safety precautions in this manual and any and all 
applicable local codes. If you do not possess these qualifications, you may not carry out the work described herein 
except for cleaning. 

 

This manual and the instructions set forth herein are part of the product and should therefore be kept for the entire 
useful life of the solar installation.  

 

Information for operators 

 

Keep these instructions safe for the entire useful life of the solar installation.  

 

Please contact your plant supplier for information concerning the formal requirements for solar systems. Please be 
sure to learn about directives and permit requirements from the responsible local authorities and energy providers 
prior to installation of the solar plant. 

 

We recommend that you insure your solar system against natural hazards (e.g. against lightning strikes). 

 

1.2

 

DISCLAIMER OF LIABILITY 

 

These instructions are only valid for products of Talesun.  

 

The information in this manual is based on Talesun’s knowledge and experience and is believed to be reliable; but 
such information including product specification (without limitations) and suggestions do not constitute a warranty, 
expressed or implied. Talesun reserves the right to change the manual, the PV products, the specifications, or product 
information sheets without prior notice. 

 

Because of the use of this manual and the conditions or methods of installation, operation, use and maintenance of 
photovoltaic products are beyond Talesun’s control,

 Talesun assumes no liability for damage, loss, or expense arising 

out of or in any way connected with such installation, operation, use or maintenance. Talesun assumes no 
responsibility extending beyond the functional capability and safety of the modules. 

This manual is only for reference.

 

 

No license is granted by implication or otherwise under any patent or patent rights. 

 

If your questions are not adequately addressed in this manual, please first contact your system supplier. You can find 
more information on our website www.talesun.com. 

 

1.3

 

PRODUCTION IDENTIFICATION 

Each module has three labels that provide the following information: 

Summary of Contents for TP572M-170

Page 1: ...kun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 INSTALLATION MANUAL For crystalline solar phot...

Page 2: ...POSE OF THE MANUAL 1 2 DISCLAIMER OF LIABILITY 1 3 PRODUCTION IDENTIFICATION 2 SAFETY GUIDELINES 2 1 GENERAL SAFETY GULDELINES 2 2 PRODUCT PRECAUTION 2 3 TRANSPORT AND STORAGE SAFETY GUIDELINES 3 MECH...

Page 3: ...f the solar installation Information for operators Keep these instructions safe for the entire useful life of the solar installation Please contact your plant supplier for information concerning the f...

Page 4: ...eries Cover the solar modules with opaque material for the entire duration of assembly Only then is the module reliably de energized Never disconnect plugs when under load Be aware that even without t...

Page 5: ...es or improper storage Ensure modules do not bow under their own weight Do not rest a module unprotected on its edges This can damage the module and the frame Do not lift or move the modules using the...

Page 6: ...stem The modules may be installed in landscape or portrait format Install the module in such a way that the junction box is positioned in the upper area of the module and the wires hang downwards The...

Page 7: ...frame Modules should be bolted to support structures through mounting holes located in the frame s back flanges only Do not drill additional holes Doing so will void the warranty Each module must be s...

Page 8: ...ructions above b Clamping installation Modules can be installed with clamps Modules must be securely attached to the mounting structure with four clamps on the long frame The modules must be properly...

Page 9: ...990mm 40mm 2400Pa 250mm 100mm 5400Pa 250mm 100mm TP648 series 1324mm 990mm 35mm 2400Pa 200mm 100mm 5400Pa 200mm 100mm 1324mm 990mm 40mm 2400Pa 200mm 100mm 5400Pa 200mm 100mm TP572 series 1580mm 808mm...

Page 10: ...nsure that the construction or structure roof facade support etc where the modules are being installed is strong enough to support the weight of the modules and all other system components If modules...

Page 11: ...ed There is no preparation required Spacing Care must be used to avoid interference between adjacent grounding clips and other components for removal of the grounding clip Removal The wire can be remo...

Page 12: ...rsion A2 Effective Date May 13 2015 ZHONGLI TALESUN SOLAR COMPANY LIMITED Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website w...

Page 13: ...Date May 13 2015 ZHONGLI TALESUN SOLAR COMPANY LIMITED Address No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Ema...

Page 14: ...ever doing so will void warranty unless this exchange is made by an authorized person Protect yourself from electric shocks while debugging or maintaining the solar power system 5 2 TROUBLESHOOTING DA...

Page 15: ...Mono crystalline 5inch 72cells Mono crystalline Dimension mm 1960 990 40 1960 990 45 1960 990 50 1640 990 35 1640 990 40 1580 808 35 1580 808 40 Weight kg 24 19 14 7or15 Module Type TP672P TP660P TP6...

Page 16: ...290 1000 IEC 290 36 4 7 97 45 3 8 63 TP672M 285 1000 IEC 285 36 2 7 88 45 2 8 53 TP672M 280 1000 IEC 280 36 2 7 74 45 1 8 41 TP660M 275 1000 IEC 275 31 1 8 85 38 3 8 95 15 TP660M 270 1000 IEC 270 31 8...

Page 17: ...290 35 9 8 09 44 7 8 72 TP672P 285 1000 IEC 285 35 8 7 97 44 6 8 65 TP672P 280 1000 IEC 280 35 7 7 86 44 5 8 56 TP672P 275 1000 IEC 275 35 5 7 76 44 4 8 49 TP672P 270 1000 IEC 270 35 4 7 64 44 3 8 4 T...

Page 18: ...215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 17 19 TP572M 205 1000 IEC 205 37 5 5 49 45 7 5 92 TP572M 200 1000 IEC 200 37 3 5 42 45 5 5 85 TP572M 195 1000 IEC...

Page 19: ...86 400 885 1098 TEL 86 512 8235 5888 FAX 86 512 8235 5588 JAPAN 6F 3 22 1 Toranomon Minato ku Tokyo Japan 105 0001 Email japan talesun com Web www talesun com jp T 03 5733 3498 F 03 34341515 USA 111 W...

Page 20: ...s No 1 Talesun Road Changkun Industrial Park Shajiabang Town Changshu Suzhou Jiangsu Province 215542 P R China Website www talesun com Email sales talesun com Tel 86 400 885 1098 19 19 THAILAND Thai C...

Reviews: