Post-assembly Operation Check Steps
(1) Initial state check
• Turn on the power switch of the product. Make sure that all the indicator lamps on
the control panel immediately light up and remain on for one second.
* After one second, the six lamps next to the dry, heat, and cool mode selection
buttons will blink.
After unpacking, assembling, and installing the product, check that it
works properly in the order of (1) to (2) as shown below.
When all these operation check steps are completed, your Care Dry G is
ready to use.
(2) Heater unit operation check
Operation check steps:
Control panel:
7
• Among the heat mode selection buttons, press the MANUAL button.
→
Press the START/STOP button once.
Make sure that the heater unit starts rotating and heating and that the fan starts
blowing.
The status indicator lights up (in blue).
FAN button
Display panel
START/STOP button
MUTE button
RESET button
Temperature level
lamps
Temperature level
setting buttons
Time setting buttons
Dry mode selection
buttons
Heat mode selection
buttons
Cool mode
selection button