background image

Post-assembly Operation Check Steps

(1) Initial state check

• Turn on the power switch of the product. Make sure that all the indicator lamps on 

the control panel immediately light up and remain on for one second.

* After one second, the six lamps next to the dry, heat, and cool mode selection 

buttons will blink.

After unpacking, assembling, and installing the product, check that it 

works properly in the order of (1) to (2) as shown below.

When all these operation check steps are completed, your Care Dry G is 

ready to use.

(2) Heater unit operation check

Operation check steps:

Control panel:

7

• Among the heat mode selection buttons, press the MANUAL button.

 Press the START/STOP button once.

Make sure that the heater unit starts rotating and heating and that the fan starts 

blowing.

The status indicator lights up (in blue).

FAN button

Display panel

START/STOP button

MUTE button

RESET button

Temperature level 

lamps

Temperature level 

setting buttons

Time setting buttons

Dry mode selection 

buttons

Heat mode selection 

buttons

Cool mode 

selection button

Summary of Contents for CARE DRY G

Page 1: ...A s s e m b l y I n s t r u c t i o n s Takara Belmont Far Infrared Hair Processor AK DRYS Model CARE DRY G 1st Version 2023 07 Request No 1E07PSA0...

Page 2: ...only The heater unit requires careful handling Do not hold it when taking the upper main unit out of the packing case or assembling the product Please make sure that all the parts are included in the...

Page 3: ...the weight and align the height adjustment pipe 3 Fully tighten the screws to fasten the height adjustment pipe to the four legged stand 5 Insert the upper main unit into the height adjustment pipe 6...

Page 4: ...ow 3 IMPORTANT IMPORTANT Insert the height adjustment pipe into the four legged stand Loosely attach them together with the four screws provided Use the provided hex key to turn the screws Make sure t...

Page 5: ...r aligning the height adjustment pipe in 2 temporarily remove the weight Then fully tighten the screws that fasten the height adjustment pipe in the position that allows the weight to properly fit in...

Page 6: ...nger legs The main unit is not properly inserted into the height adjustment pipe Recheck the orientation of the upper main unit with respect to the stand and insert the main unit again Move on to 6 Sc...

Page 7: ...at the center of the upper main unit is aligned with that of the stand If they are not aligned with each other go back to 6 to realign them and tighten the screws Check that the product works properly...

Page 8: ...own below When all these operation check steps are completed your Care Dry G is ready to use 2 Heater unit operation check Operation check steps Control panel 7 Among the heat mode selection buttons p...

Reviews: