
THE-100 Series
Rev 1
2020/11/27
13/18
Copyright © 2020 by TAEHA CORP. All Rights Reserved
5
How to use
5.1
Ready
No.
Image
Description
1
1-1) Supply air with a maximum of 0.9MPa to the
outer diameter Ø6tube.
1-2) Insert the Power cord.
1-3) After inserting the Foot switch into the control
terminal, turn the screw to firmly attach it.
1-4) Turn on the Combination switch.
When turned on, the lamp lights up.
2
Insert the joint of the adapter assembly into the Air
out port on the front of the controller.
3
Before adding material, clean the barrel and needle
with dry air to prevent foreign matter.
4
Put the material so that it does not contain air
bubbles. Fill up to 70-80% of the barrel capacity, and
wipe off any liquid on the top 1-2 cm.
5
Insert the adapter assembly head into the barrel head
and rotate it 90 ° afterwards to prevent it from coming
off.
Adapter head
Summary of Contents for THE-100 Series
Page 1: ...THE 100 Series User manual...