According to
DIN 15018 T3, different stress tolerance coefficients are determined for different high-
strength fine-grain construction steels. TADANO cranes have been designed in compliance with
this standard for the load spectrum S
1
light as well as a stress tolerance coefficient of 25000 load
cycles. A suitable service life of a crane is determined based on this and the operating conditions.
The service life does not depend solely on the specified stress tolerance coefficient, but primarily
depends on the loads exerted on the crane during the operation period.
The following drawings
[page 470] show a few load-bearing steel structures of the crane and give
the tester a few indications regarding the points to be checked. Points marked with arrows are
highly stressed zones and must be checked when testing and depending on the operating condi‐
tions.
We would however like to explicitly emphasize that the drawings do not claim to be complete.
If damage (e.g. cracks, deformations) is detected during these tests, please contact an expert.
After inspecting the damage as per the instructions in the chapter "Welding and Alignment work"
from the Maintenance and repair section, consult TADANO.
The repair method should then be decided on in consultation between TADANO and the expert.
WARNING
Welding activities not carried out properly!
Damaged parts may fail under load. It may result in an accident involv‐
ing personal injuries or even death.
1. Only expert personnel may carry out welding activities.
2. Welding regulations must be observed implicitly.
4.2.1 Measures to protect electronic parts during welding
CAUTION
The ground terminal of the welding machine is connected to an incor‐
rect point on the mobile crane!
The flow of current can cause damage to loose connections, e.g. tooth
flanks, bearings, spline ends, shafts, the electronics, the automatic safe
load indicator, etc.
1. When electrowelding, the ground terminal of the welding machine
must be connected directly to the part to be welded.
If it is necessary to carry out welding on the mobile crane, the following steps must be carried out
before beginning work to protect the electronic control units:
1. Switch off the battery main switches in the carrier and the superstructure,
2. Disconnect the battery cables at the negative poles in the carrier and the superstructure, then
disconnect the battery cables at the positive pole and connect with each other,
4 Crane testing instructions
468
ATF 130G-5 2146097
2014-09
Summary of Contents for ATF 130G-5
Page 2: ......
Page 8: ...Table of Contents 8 ATF 130G 5 2146097 2014 09...
Page 30: ...2 General safety instructions 30 ATF 130G 5 2146097 2014 09...
Page 31: ...2 General safety instructions ATF 130G 5 2146097 2014 09 31...
Page 32: ...2 General safety instructions 32 ATF 130G 5 2146097 2014 09...
Page 33: ...2 General safety instructions ATF 130G 5 2146097 2014 09 33...
Page 50: ...2 General safety instructions 50 ATF 130G 5 2146097 2014 09...
Page 51: ...2 General safety instructions ATF 130G 5 2146097 2014 09 51...
Page 64: ...2 General safety instructions 64 ATF 130G 5 2146097 2014 09...
Page 68: ...3 1 3 Operating elements 3 Operation 68 ATF 130G 5 2146097 2014 09...
Page 101: ...3 Operation ATF 130G 5 2146097 2014 09 101...
Page 188: ...3 8 2 Outrigger Alarm displays 3 Operation 188 ATF 130G 5 2146097 2014 09...
Page 228: ...1 Counterweight cylinder 3 Operation 228 ATF 130G 5 2146097 2014 09...
Page 229: ...3 Operation ATF 130G 5 2146097 2014 09 229...
Page 236: ...Counterweight variant 31 7 t 69886 5 lbs 3 Operation 236 ATF 130G 5 2146097 2014 09...
Page 239: ...Counterweight variant 42 3 t 93255 5 lbs 3 Operation ATF 130G 5 2146097 2014 09 239...
Page 240: ...Mounting instruction 3 Operation 240 ATF 130G 5 2146097 2014 09...
Page 466: ...3 Operation 466 ATF 130G 5 2146097 2014 09...
Page 471: ...Boom 4 Crane testing instructions ATF 130G 5 2146097 2014 09 471...
Page 472: ...Stinger 4 Crane testing instructions 472 ATF 130G 5 2146097 2014 09...
Page 473: ...Boom end 4 Crane testing instructions ATF 130G 5 2146097 2014 09 473...
Page 474: ...Intermediate section 4 Crane testing instructions 474 ATF 130G 5 2146097 2014 09...
Page 484: ...4 Crane testing instructions 484 ATF 130G 5 2146097 2014 09...
Page 491: ...5 1 9 Wiring diagram 5 Rectifying the faults ATF 130G 5 2146097 2014 09 491...
Page 492: ...5 Rectifying the faults 492 ATF 130G 5 2146097 2014 09...
Page 493: ...5 Rectifying the faults ATF 130G 5 2146097 2014 09 493...
Page 494: ...5 Rectifying the faults 494 ATF 130G 5 2146097 2014 09...
Page 502: ...7 Service and Maintenance 502 ATF 130G 5 2146097 2014 09...
Page 510: ...7 0 General instructions 4 4 ATF130G 5 2010 12 0260_EN_FA046_7_00_00_00_FA036 DOC Notes...
Page 512: ...7 1 Maintenance intervals 2 14 ATF130G 5 2010 12 G 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Page 521: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 11 14 Notes...
Page 522: ......
Page 523: ...Maintenance intervals 7 1 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc 13 14 Notes...
Page 524: ...7 1 Maintenance intervals 14 14 ATF130G 5 2010 12 0265_EN_FA046B_7_01_00_00_FA029 doc Notes...
Page 536: ...7 2 Engine 12 12 ATF130G 5 2013 11 0270_EN_FA046B_7_02_00_00_FA029 ab FZ 066 doc Notes...
Page 566: ...7 7 Electrical system 12 12 ATF130G 5 2010 12 0295_EN_FA046B_7_07_00_00_FA029 DOC Notes...
Page 570: ...7 8 Crane cab 4 4 ATF130G 5 2010 12 0300_EN_FA046_7_08_00_00_FA029 DOC Notes...
Page 580: ...7 10 Compressed air system 6 6 ATF130G 5 2010 12 0307_EN_FA046_7_10_00_00 DOC Notes...
Page 588: ...8 Annex Manufacturer s documents 588 ATF 130G 5 2146097 2014 09...
Page 602: ...8 Annex Manufacturer s documents 602 ATF 130G 5 2146097 2014 09...
Page 614: ...8 Annex Manufacturer s documents 614 ATF 130G 5 2146097 2014 09...
Page 615: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 616: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 617: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 618: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 619: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 620: ...Application Letter EAI S MTU C I Agriculture 2011 001...
Page 622: ...8 Annex Manufacturer s documents 622 ATF 130G 5 2146097 2014 09...
Page 632: ...8 Annex Manufacturer s documents 632 ATF 130G 5 2146097 2014 09...