background image

TMA 2940/Q400 Packup instructions 

Back to Thermal Menu 

 

9.  Install the bolt in the other end of the outer clamp and tighten. (Fig 10). 
 
10. The suspension should now be immobilized. 
 

 

Figure 10 

 

11. Install the rear shipping foam support under the lower weights. (Fig 11) 
 

 

Shipping Foam 

Lower Weights 

 

Figure 11 

Ehc 

 

5 of 5 

Back to Thermal Menu

 

Back to Top

 

Summary of Contents for TMA 2940

Page 1: ...stage from the instrument 2 Remove the outer cover around the shuttle assembly 3 Remove the weight tray Tape the nylon screw in place and lay the weight tray in the top of the furnace Fig 1 2 Weight T...

Page 2: ...cket Figure 3 Shoulder bolts 8 Front Support Rear Supports 2 Outer Clamp Figure 3 5 Carefully slide the front support bracket between the upper and lower suspensions behind the weight tray mounting br...

Page 3: ...r supports between the upper and lower suspensions Fig 7 Rear Supports Shuttle Lift Arm Figure 7 7 Install the shoulder bolts through the front support bracket and thread them into the rear support br...

Page 4: ...enu 8 Remove one of the bolts from the outer clamp and install the outer clamp The clamp should go above and below the upper and lower suspensions Fig 9 Outer Clamp Upper Suspension Lower Suspension F...

Page 5: ...bolt in the other end of the outer clamp and tighten Fig 10 10 The suspension should now be immobilized Figure 10 11 Install the rear shipping foam support under the lower weights Fig 11 Shipping Foam...

Page 6: ...hermal Menu 12 Lower the furnace Tape the weight tray into the top of the furnace 13 Place the cardboard sleeve over the furnace lift shaft Fig 12 13 Lockdown Cap Cardboard Sleeve Figure 12 Figure 13...

Page 7: ...h located on the back of the instrument near the power cord Back to Top 2940 19 Remove the instrument feet and place the instrument on the shipping plywood 20 Secure the instrument to the plywood with...

Reviews: