![T R Knapp Model Engineering SEARAILS RR-Series Assembly Manual Download Page 7](http://html1.mh-extra.com/html/t-r-knapp-model-engineering/searails-rr-series/searails-rr-series_assembly-manual_3068525007.webp)
ASSEMBLY MANUAL – SEARAILS RR-XX – 0-4-0 SYTEAM LOCOMOTIVES
3/30/15
T R Knapp Model Engineering
6
15
Crank pins pressed into drivers
through side rod and main rod;
there should be a little slop in
the assembly.
16
Rods and driver subassemblies;
note slight offset bent into main
rod to assure clearing crank pin
in front axle.
17
Press cylinder castings onto
pilot casting; DO NOT FORCE –
if too tight a fit, ream holes in
cylinders.