Systimax PATCHMAX GS3 Instruction Sheet Download Page 5

www.commscope.com 

 

860582188 

Instruction Sheet 

 

Page 5 of 8 

 

Step 3 

– Cable Modules 

 

 

 

 

Call outs above correspond to items listed on next page. 

 

 

 

Release snap

Rotate and
remove module

Insert module
posts into slots

Route cables through
panel opening

Replace module

Terminate
cables

Attach retainer
bar

Attach
retainer
bar

Secure cables to
retainer bar

Route cables

Attach designation label

Front View

Rear View

Summary of Contents for PATCHMAX GS3

Page 1: ...termination manager 760062364 PM GS3 48 w Termination Mgt PATCHMAX GS3 Cat 6 U UTP copper patch panel 48 port equipped with termination manager 760001669 PM GS3 2U PATCHMAX GS3 24 port panel kit witho...

Page 2: ...anagers 1 2 1 2 Label sheet White 4 labels per sheet 1 2 1 2 Label sheet Blue 4 labels per sheet 4 8 4 8 Hook and loop straps 4 4 4 4 Mounting screws 1 1 1 1 Instruction sheet Specifications Wire Term...

Page 3: ...ons When using this product the following basic safety precautions should be followed to reduce the risk of fire electric shock and injury to persons 1 Never install communications wiring in wet locat...

Page 4: ...2 Populate Panel with Distribution Modules For Panel Kits Only Note Distribution modules are ordered separately 1 From the front side of the panel insert the module into the desired panel opening 2 R...

Page 5: ...spond to items listed on next page Release snap Rotate and remove module Insert module posts into slots Route cables through panel opening Replace module Terminate cables Attach retainer bar Attach re...

Page 6: ...tools Correct procedure for using the termination manager is provided in the next section of this instruction 6 Unsnap module rotate and replace into original panel opening 7 Attach rear retainer bar...

Page 7: ...Green Orange 3 Insert held pairs through holes on top surface of termination manager two pairs per hole as shown The TOP surface is identified with a T which can be oriented either right side up or u...

Page 8: ...Using the D 914 punch tool with M110 blade punch down conductors making sure the tool is straight and that conductors fully engage in the IDC terminals Stagger the punch down tool up and down so that...

Reviews: