12 / 16    |    PP-105_201608    |    FGS

4 Inspection of the FGS

Each FGS should be inspected immediately after installation, as 

well as every 12 months, based on the following steps:

1. 

Identification of the FGS

2. 

Date of inspection

3.  Check the electrical connection of the activation mechanism

4. 

Check the electrical connection of the end switches

5. 

Check the FGS for cleanliness, and eventual treatment (when 

necessary)

6.  Remove the protective grating.
7.  Check the tightness of the blades, and record their eventual 

correction (when applicable)

8. 

Check the Intumex and rubber sealings, and record their 

eventual correction (when applicable)

9. 

Check the safety FGS closure - for details see Chap. 3

10. 

Check the FGS functionality (for details see Chap. 3) with 

regard to opening and closing the control system, tracking 

the physical behaviour of the FGS and the signalisation of 

the end positions, and record their eventual correction (when 

applicable)

11. 

Set into the operating position - see Chap. 2.1 

12. Assemble the protective grating.

13. 

Record into Operating log (page 13) with the name and 

signature of the technician.

The FGS is usually part of a system. In this case the system must 

be checked as specified in its operational and maintenance 

requirements – this is a task for the installer of the entire system.

5 Warranty conditions

For the warranty conditions, please contact our Systemair 

colleagues in your respective country.
Before installing the FGS, its functionality must be tested 

according to Chapter 3 (“Functionality check“)

DO NOT INSTALL A NON-FUNCTIONING FGS!

Changes to the functionality of the FGS, caused by transport or 

installation, aren‘t reclaimable after installation (deformations, 

damages, mechanical damage of the sealing material, foreign 

objects which can constrain the blade movement, improper 

handling of the activating mechanism, etc.)

The FGS is transported via a covered means of transport, on 

pallets or in boxes. When handling during transportation and 

storage, the FGS must be protected against damage and weather 

conditions. Blades of FGS must be in closed position. These 

products must be stored in a closed and dry area where the 

temperature is kept within the range of -20 °C to +50 °C.

Summary of Contents for FGS

Page 1: ...FGS FIRE AIR GRILLE ORIGINAL INSTALLATION MAINTENANCE AND OPERATION MANUAL EVERY FIRE AIR GRILLE MUST BE INSTALLED IN ACCORDANCE WITH THIS MANUAL ...

Page 2: ...struction Installation tested at underpressure Pa Wet Dry Soft crossing Instal kit On a wall Out of a wall 200 200 up to 800 1000 FGS Upper part EI60Sa ve 50 50 Lower part EI90Sa ve 50 50 Only rigid wall Fig 1 RSW Solid wall with a rectangular opening NOTE Dimensions L1 L 260 mm and H1 H 135 mm L H nominal dimensions s L1 H 1 1 1 Concrete masonry cellular concrete Legend Fire resistivity min s mm ...

Page 3: ...ng 3 Screw e g 5 100 fabory 29385 050 100 4 Screw e g DIN 7982 C H 4 2 13 5 This side of the frame is always aligned with the wall 6 Screw DIN 7504M SR 4 2 25 fix after inserting the FGS into the frame Pos 1 Legend Fig 2 Wet installation of the FGS frame in a rigid wall using a mixture of plaster or mortar or concrete ...

Page 4: ...g fabory 29385 050 100 4 Layer of fire resistant mastic at least 2 mm thick 5 Screw 4 2 13 e g DIN 7982 C H 6 This side of the frame is always aligned with the wall 7 Screw DIN 7504M SR 4 2 25 fix after inserting the FGS into the frame Pos 1 Legend Fig 3 Installation of the FGS frame into a soft crossing in a rigid wall 1 1a 1b 3 2 4 5 6 7 ...

Page 5: ... 80 Fig 7 Wiring diagram DV9 T ST with actuator BFL BFN24 T ST 1 2 S1 S2 S3 S4 S5 S6 Tf Tf LED BAT 5 80 T Plug connection to communication and power supply units Application examples for integration into monitoring and control systems or into bus networks can be found in the documentation of the connected communication and power supply unit see see Accessories Tf Thermoelectric fuse see Technical ...

Page 6: ...n 3 blue wire 4 grey wire DV1 2 1 yellow green wire 2 black wire closed position 3 blue wire 4 grey wire 5 black wire open position 6 blue wire 7 grey wire DV7 T DV9 T 1 yellow green wire 2 brown wire 230 V AC 2 red wire 3 blue wire 3 black wire 4 violet wire S1 5 red wire S2 6 white wie S3 7 orange wire S4 8 pink wire S5 9 grey wire S6 DV9 T ST Actuator BFL24 T connect as version DV9 T Legend Fig...

Page 7: ...FGS PP 105_201608 7 16 Fig 12 Release the closed mechanism NOTE push the spring with the screwdriver in the direction indicated by the arrow ...

Page 8: ...8 16 PP 105_201608 FGS Fig 13 Twist the blades into the horizontal position ...

Page 9: ...m NOTE push the thermal fusible link in the direction indicated by the arrow Fig 14 Fix the first blade on the top side with the thermal fusible link NOTE pull the thermal fusible link in the direction indicated by the arrow and hang on sheet metal hook ...

Page 10: ...The distance between the FGSs must be at least 200 mm in a solid wall according to EN 1634 1 The distance between the FGS and the wall must be at least 250 mm according to EN 1634 1 The FGS must be installed along the horizontal blade axis Before the installation of the FGS its functionality must be tested according to Chapter 3 Functionality check DO NOT INSTALL A NON FUNCTIONING FGS Changes to t...

Page 11: ...ecked and set into the open operating position 2 1 1 Manual FGS On the bottom of the front right side one hole is placed Fig 12 Insert a screwdriver through this hole or a thin object with a diameter of 6 mm max lever up the upper blade and push the latch spring this releases the mechanism Twist the blades into the horizontal position in the direction indicated by the arrow Fig 13 force against th...

Page 12: ...protective grating 13 Record into Operating log page 13 with the name and signature of the technician The FGS is usually part of a system In this case the system must be checked as specified in its operational and maintenance requirements this is a task for the installer of the entire system 5 Warranty conditions For the warranty conditions please contact our Systemair colleagues in your respectiv...

Page 13: ...ion following the elimination of these deficiencies Inspecting technician s signature Periodic inspections of the FGS fire air grille at least once every 12 months Date Description of any defects found and the date of the inspection following the elimination of these deficiencies Inspecting technician s signature OPERATING LOG ...

Page 14: ...eriodic inspections of the FGS fire air grille at least once every 12 months Date Description of any defects found and the date of the inspection following the elimination of these deficiencies Inspecting technician s signature ...

Page 15: ...eriodic inspections of the FGS fire air grille at least once every 12 months Date Description of any defects found and the date of the inspection following the elimination of these deficiencies Inspecting technician s signature ...

Page 16: ...laim submission Date of the repair Description of the repair Service officer signature stamp Warranty service 1488 IMOS Systemair 90043 Kalinkovo 371 Slovakia 1488 CPR xxxx ETAG 026 Part 4 Mechanical Air Transfer Grille Fire air grille FGS L H See ETA for relevant characteristics NOTE certificate numbers will be known upon completion of the certification ...

Reviews: