Technique — Double-Lead Cable
continued
3
Thread cable through the crimp
Thread the cable leader through the crimp sleeve and
pull up the slack in each cable.
4
Attach Pretensioner
Instrument
321.744
Pretensioner
Gently pull each cable sequentially for provisional tightening.
Next, depress the button on the side of the Pretensioner
and pass the cable in the indicated direction. Releasing the
button automatically locks the cable.
6
Synthes Spine
Spine Cable System