
7
Step 2:
Connect the other end of the AC power cord to the AC power
outlet.
Step 3:
Check the SYS LED. If it is ON, the power connection is correct.
Figure 6:Connecting AC power cord
Installing SFP Modules
You can install or remove a mini-GBIC SFP module from a SFP port
without having to power off the switch.
Step1:
Insert the module into the SFP port.
Step2:
Press firmly to ensure that the module seats into the connector.
Figure 7:Installing a SFP Module into a SFP Port
Note
: