Symphony SYK-1006 Setup Instructions Download Page 5

© 2020

Step 1 of 5

Locked layer contains

placeholder marks.

When assembled

Connection Lock

w/ Knob

*

BACK VIEW

Knobs face back of assembly.

Tool-less Spline Connector

1. Place extrusions end-to-end.

2. Slide tool-less connectors

    across seam of extrusions.

*

3. Tighten all knobs to secure connection.

Tool-less Corner Connector

1. Slide extrusion onto

    Corner Connector.

2. Tighten all knobs to

    secure connection.

*

Keep corner connectors attached to horizontal extrusions.

Assemble frame flat on ground.

1) Place key hole over bolt on panel

    & slide down.

2) Twist knob to secure connection.

Base Plate Attachment

*

bolt

knob

Base Plate

threaded

hole

key hole

*

*

*

*

*

*

*

*

*

*

*

*

1

2

3

4

8

10

12

11

5

6

7

*

FRONT VIEW

Curved

tool-less

connector

Curved

tool-less

connector

Item

1

2

3

4

5

6

7

8

9

10

11

12

13

Qty.

1

1

1

1

1

1

1

1

1

1

1

1

2

Description

45”h TSP49 Vertical Extrusion

31.305”h TSP49 Vertical Extrusion

45”h TSP49 Vertical Extrusion

31.305”h TSP49 Vertical Extrusion

36.467”w TSP49 Horizontal Extrusion

36.467”w TSP49 Horizontal Extrusion

36.467”w TSP49 Horizontal Extrusion

38.019”w TSP49 curved Horizontal Extrusion

38.019”w TSP49 curved Horizontal Extrusion

38.019”w TSP49 curved Horizontal Extrusion

43.209”h Z45 Vertical Extrusion

43.423”h Z45 Vertical Extrusion

6” x 22” End Base Plate w/ foot

Steps:

Refer to the Tool-less Frame Assembly general information page.

1) Assemble vertical extrusions [1-2], [3-4], [11-12] & horizontals [5-6-7], [8-9-10]

    together, using 

Tool-less Spline connectors

.

2) Connect vertical assemblies [1/2], [3/4] between horizontal

    assemblies [5/6/7], [8/9/10], using 

Tool-less Corner Connectors

.

3) Install Base Plates [13] to bottom corners of frame assembly

    as shown. See 

Base Plate Attachment

 

detail.

4) Lift frame to upright position, then connect vertical assembly [11/12] between

    horizontal assemblies [5/6/7], [8/9/10] using 

Connection Lock w/ Knob

.

*

*

13

13

Backwall Frame Assembly

Summary of Contents for SYK-1006

Page 1: ...ctive View Plan View 10 10 Symphony SYK 1006 10 x 10 Portable Display If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP...

Page 2: ...2020 1 sq ft Plan View...

Page 3: ...Use a MILD NON ABRASIVE cleanser and soft cloth paper towel to clean all surfaces Keep exhibit components away from heat and prolonged sun exposure Heat and UV exposure will warp and fade components R...

Page 4: ...en slide vertical extrusions onto corner connectors of lower horizontal extrusion 2 Slide corner connectors of upper horizontal extrusion into grooves of vertical extrusions Disassembly 1 Loosen all k...

Page 5: ...h TSP49 Vertical Extrusion 45 h TSP49 Vertical Extrusion 31 305 h TSP49 Vertical Extrusion 36 467 w TSP49 Horizontal Extrusion 36 467 w TSP49 Horizontal Extrusion 36 467 w TSP49 Horizontal Extrusion 3...

Page 6: ...with fabric to outside into the channel Repeat for other side of this corner Step 2 Repeat Step 1 for opposite corner C then insert corner B followed by corner D to complete the installation of the co...

Page 7: ...sion Slide Bracket forward Slide down onto V4 connector Tighten knobs to secure Mounting Bracket Workstation Bracket Attachment Slide bracket forward then down onto V4 connector Tighten thumb screws t...

Page 8: ...on Slide Bracket forward Slide down onto V4 connector Tighten knobs to secure Mounting Bracket Monitor Mount Bracket Attachment Slide bracket forward then down onto V4 connector Tighten thumb screws t...

Page 9: ...pper legs to underside of Counter Top Twist to tighten 2 Connect lower Legs through Counter Shelf to upper Legs as shown 3 Attach middle leg to underside of Counter Top Twist to tighten Note Holes for...

Reviews: