© 2020
Locked layer contains
placeholder marks.
= 1 sq ft
Plan View
Page 1: ...ctive View Plan View 10 10 Symphony SYK 1006 10 x 10 Portable Display If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP...
Page 2: ...2020 1 sq ft Plan View...
Page 3: ...Use a MILD NON ABRASIVE cleanser and soft cloth paper towel to clean all surfaces Keep exhibit components away from heat and prolonged sun exposure Heat and UV exposure will warp and fade components R...
Page 4: ...en slide vertical extrusions onto corner connectors of lower horizontal extrusion 2 Slide corner connectors of upper horizontal extrusion into grooves of vertical extrusions Disassembly 1 Loosen all k...
Page 5: ...h TSP49 Vertical Extrusion 45 h TSP49 Vertical Extrusion 31 305 h TSP49 Vertical Extrusion 36 467 w TSP49 Horizontal Extrusion 36 467 w TSP49 Horizontal Extrusion 36 467 w TSP49 Horizontal Extrusion 3...
Page 6: ...with fabric to outside into the channel Repeat for other side of this corner Step 2 Repeat Step 1 for opposite corner C then insert corner B followed by corner D to complete the installation of the co...
Page 7: ...sion Slide Bracket forward Slide down onto V4 connector Tighten knobs to secure Mounting Bracket Workstation Bracket Attachment Slide bracket forward then down onto V4 connector Tighten thumb screws t...
Page 8: ...on Slide Bracket forward Slide down onto V4 connector Tighten knobs to secure Mounting Bracket Monitor Mount Bracket Attachment Slide bracket forward then down onto V4 connector Tighten thumb screws t...
Page 9: ...pper legs to underside of Counter Top Twist to tighten 2 Connect lower Legs through Counter Shelf to upper Legs as shown 3 Attach middle leg to underside of Counter Top Twist to tighten Note Holes for...