
6
Installation
9) Install wall elbow (Q) to stub
out pipe. Tighten set screw
to secure.
10) Attach shower arm (B) and
flange (C) to vertical shower pipe
turning clockwise to tighten.
11) Install showerhead (A) to shower
arm (B). Turn clockwise to
tighten.
12) Attach large end of hand shower
hose (S) to hand shower wand
(P). Attach small end of hand
shower hose (S) to vacuum
breaker (R). Connect vacuum
breaker to wall elbow (Q). Turn
clockwise to tighten.
1
2
B
C
Q
R
3
1
4
2
P
S
S
1
2
Q
1
2
B
A
Operation (Temperature Control)
1) Turn shower handle counter-
clockwise approximately 1/4 turn
to put valve in cold position.
2) Turn shower handle counter-
clockwise approximately 1/2 turn
to put valve in warm position.
3) Turn shower handle counter-
clockwise approximately 3/4 turn
to put valve in hot position.