![Symmetry Office APEX-SYMAC Series Installation Instructions Manual Download Page 13](http://html.mh-extra.com/html/symmetry-office/apex-symac-series/apex-symac-series_installation-instructions-manual_1419670013.webp)
Installation Instructions
APEX-SYMAC Series
13
APEX-SYMAC2/SYMAC3
1.
Adjust arm angles as desired within a 90 degree range from
the pivot point of the arm and a perpendicular centerline of
mount. (See Figure 22)
WARNING:
Swinging the arm beyond this range may result
in the mount slipping of the desk causing serious injury!
Figure 22
Cable Management
1.
Press insides of cable management covers at both ends to
unhinge tabs on either end of cable management cover on
upper arm. (See Figure 23)
2.
Lift cable management cover up until tabs are unhinged and
cover is in the “open” position. (See Figure 23)
Figure 23
Figure 24
3.
Route cables through cable management channel. (See
Figure 24)
IMPORTANT ! :
Be sure to leave enough slack in the
cables near display and arm joint to allow for full arm
articulation!
4.
Close cable management cover on monitor arm. (See
Figure 24)
5.
Route cable through clip at arm connection point. (See
Figure 24)
APEX-SYMAC2D
1.
Install array cable clips (J7) to back of array. (See Figure 25)
2.
Route cables through array cable clips (J7) as desired. (See
Figure 25)
3.
Route cables through arm cable clips as desired. (See
Figure 25)
Figure 25
perpendicular centerline
90 degrees range
of motion per arm
pivot point of the arm
(top view)
cable management cover tabs
1
2
2
4
3
2
cable (typical)
cable clip
5
(J7)
2
1
3