5. The values of V and R will be determined by the current required to generate a GF trip condition:
I = Vrms/R, where I = 115% of GF setting.
6. Place the unit in the RUN position, apply 3-phase power and allow the NO contact to close.
7. Energize the test circuit by pushing and holding the test pushbutton until the unit trips (within 8.5
seconds). The display should show “GrF” and the NO contacts should be open. Release the NO
pushbutton.
8. The results of the test are to be recorded on the test form provided. The form should be kept by
those in charge of the building’s electrical installation in order to be available to the authority
having jurisdiction.
9. Confirm programmed parameters and proceed with installation instructions.
-----------------------------------------------------
GROUND FAULT TEST RESULTS*
Date
Performed by
Results Location
*A copy of this form should be retained by the building’s electrical foreman.
-----------------------------------------------------
SymCom warrants its microcontroller-based products against defects in material or workmanship for
a period of five (5) years from the date of manufacture. All other products manufactured by SymCom
shall be warranted against defects in material and workmanship for a period of two (2) years from
the date of Manufacture. For complete information on warranty, liability, terms, returns, and
cancellations, please refer to the SymCom Terms and Conditions of Sale document.