Installation and wiring 

 

Page 12/24 

 Installation, commissioning and maintenance instructions SYCLOPE 

«  TURBIPOOL Primary

®

 »  

Electrical installations must be carried out according to the standards in force and by 

authorized personnel! 

However, the electrical connections are at low voltage (below 35VDC). 

Before connecting the turbidity probe, switch off the power supply of the controller! 

 

On the controller side, preferably use crimped cable ends to ensure that no wire can come 

into contact with neighbouring cables! 

Secure the wire connections to the terminal blocks using clamps. 

 

 

 

 

 

 

 

The SYCLOPE TURBIPOOL 

Primary

®

 turbidity probe does not have internal fuse. Do not 

open when powered! 

 

4)

 

Identification and connections of the turbidity probe wires 

The  SYCLOPE TURBIPOOL 

Primary

®

  turbidity probe must be powered by an external 

voltage power supply  (between 12V to  35V DC). In general, this primary power supply is 

provided by the SYCLOPE or compatible measuring device. 

 

 

Red : Positive voltage (12~35VDC) 
Brown : Ground voltage (0V) 
Blue : Unpolarised 4…20mA loop 
Green : Unpolarised  4…20mA loop 

 

 

The 4…20mA output current loop is passive signal. It is therefore necessary to provide an 

additional power supply to ensure the operation of the loop. In general, this power supply is 

provided by the SYCLOPE controller. 

 

 

The  SYCLOPE TURBIPOOL 

Primary

®

  turbidity probe does not have a power supply 

switch. It is immediately powered when connected to the device. 

 

5)

 

Connection conditions of hydraulic tubing 

The  SYCLOPE TURBIPOOL 

Primary

®

  turbidity probe  must be supplied with swimming 

pool water and with the supplied tubing. 

 

In all cases, the 8x5mm tubing diameter must not be changed! 

 

The sampling flow-rate must be constant and can be set by one of the SYCLOPE series 

housing chamber containing a micrometric adjustment device. 

 

 

No filter system or sampling flow-rate adjustment should be installed BEFORE the turbidity 

measuring probe! 

Summary of Contents for TURBIPOOL Primary

Page 1: ...Installation commissioning and maintenance instructions Reference TUR 20x0 Rev 1 01 On line Turbidity probe for swimming pools TURBIPOOL Primary...

Page 2: ...8 Rev 1 01 On line turbidity probe TURBIPOOL Primary range Installation commissioning and maintenance manual Ref DOCxxxx Editor SYCLOPE Electronique S A S Z I A ropole pyr n es Rue du Bruscos 64 230 S...

Page 3: ...surements 10 2 Technical features 10 IV Installation and wiring 11 1 Installation conditions 11 2 Installation mural de la sonde de turbidit 11 3 Electrical connections of the turbidity probe 11 4 Ide...

Page 4: ...OOL Primary turbidity probe operates on the principle of an infrared beam at 860 nm and a measurement of turbidity achieved with an optical sensor positioned at a 90 angle compared to the emitting bea...

Page 5: ...ms will be used Information Action to be done Element of a list or an enumeration 3 Signs and symbols Identification of a direct voltage or a direct current Identification of an alternating voltage or...

Page 6: ...storage Temperature 10 C to 60 C Humidity Maximum 90 without condensation 5 Packaging The turbidity probe is delivered with a power and signal cable at very low voltage Included into the packaging Tu...

Page 7: ...ined in the use of the device and its environment has read and understood this manual warnings and handling rules 3 Risks prevention Installation and connection of the SYCLOPE TURBIPOOL Primary turbid...

Page 8: ...arning Read the instructions Product reference Specific recyclable product Power supply range Limitation of dangerous substances Maximum current value CE compliant Protection class of the case Native...

Page 9: ...disposed of in household or industrial waste In accordance with the regulations in force consumers in the European Union are required from this date to return their old equipment to the manufacturer...

Page 10: ...PE or PTFE tubing 8x5mm Max pressure 2 bars Max temp of water 0 to 50 C 32 F to 122 F Primary power supply Between 12 35VDC isolated 0V V Consummation 0 26 mA Maxi Signal output 0 4 20mA Passive outp...

Page 11: ...rements can be disturbed The guarantee will not be accepted 2 Installation mural de la sonde de turbidit Before processing to wire electrical connections switch off power of the controller The IP65 ra...

Page 12: ...o 35V DC In general this primary power supply is provided by the SYCLOPE or compatible measuring device Red Positive voltage 12 35VDC Brown Ground voltage 0V Blue Unpolarised 4 20mA loop Green Unpolar...

Page 13: ...e noted Do not take the sample under overflow or increase the sampling depth if this is the case The proximity of bathers can cause a disturbance of the sample Installation near a discharge outlet or...

Page 14: ...filter s outlet backwash water When the turbidity measurement of the backwash water returns within a user defined threshold the process is reversed and the filter is again switched to the washing posi...

Page 15: ...sed cleaning or replacing the borosilicate glass tub and changing his seals 1 Procedure for opening and closing the probe for maintenance operations WARNING Before opening the turbidity probe block ma...

Page 16: ...s tub c Remove the 3 hexagonal screws M4x40 using the Allen wrench put the set of screws aside and lift the top cover of the probe taking care not to drag the borosilicate glass tub out of its housing...

Page 17: ...duits In this case take care to eliminate all traces of moisture before reassembly g Preparing the reassembly of the O ring seals and the borosilicate glass tub Perform coarse cleaning of the borosili...

Page 18: ...y probe s cover and position it on top of the lower block k Tighten the M4x40 fixing screws by crossing mode operation in order to balance the clamping force and to prevent breaking the borosilicate g...

Page 19: ...to be sure the signal will be over 4mA minimum A zero calibration must be performed with distilled water see calibration procedure 2 4mA fixed Significant anomaly detected by the integrated processor...

Page 20: ...Notes Page 20 24 Installation commissioning and maintenance instructions SYCLOPE TURBIPOOL Primary...

Page 21: ...Notes Page 21 24 Installation commissioning and maintenance instructions SYCLOPE TURBIPOOL Primary NOTES...

Page 22: ...Notes Page 22 24 Installation commissioning and maintenance instructions SYCLOPE TURBIPOOL Primary...

Page 23: ...Page 23 24 Installation commissioning and maintenance instructions SYCLOPE TURBIPOOL Primary...

Page 24: ...ectronique S A S Z I A ropole pyr n es Rue du Bruscos 64 230 SAUVAGNON France Tel 33 05 59 33 70 36 Fax 33 05 59 33 70 37 Email syclope syclope fr Internet http www syclope fr 2017 by SYCLOPE Electron...

Reviews: