SWP 9032H Operator'S Manual Download Page 8

3  INSTALLATION

 

3.1 Unpacking

 

 

Use the packing lists to identify and account for each item.

 

 

3.1.1  Inspect each item for possible shipping damage. If damage is evident, contact 

 

 

      your distributor and / or shipping company before proceeding with the 

 

 

     installation.

 

 

3.1.2  When using a forklift, its arm length must be long enough to reach the outside 

 

 

      so as to ensure safe lifting.

 

 

3.1.3  The movement may cause potential danger or substantive hazard. Make sure 

 

 

      the machine is in a safe position before using.

 

3.2  Input Power Connections

 

 

Supply input connection of CUT 60 power is shown as the Fig 3.1.

 

 

3.2.1  Check your power source for correct voltage before plugging   

 

 

 

 

      in or connecting the unit

 

 

3.2.2  Power Cord and Plug. This power supply includes an 

 

 

      input power cord and plug suitable for 220V AC 1 – 

 

 

      Phase input power.

 

 

3.2.3  If the power supply voltage continually goes beyond 

 

 

      the range of safe work voltage range, it will shorten 

 

 

      the machine’s life-span. The following measures can 

 

 

      be used:

 

 

      •  Change the power supply input, eg. connect the 

 

 

        machine with the stable power supply voltage of 

   

     distributor.

 

 

      •  Reduce the machine’s power supply at the same 

   

     time.

 

 

      •  Set the voltage stabilisation device in the front of power cable input.

 

 

3.3  Gas Connections

   3.3.1 

Connecting Gas Supply to Unit

 

 

      Connect the gas line to the inlet port of the gas filter on the rear panel.

   3.3.2 

Check Air Quality

 

 

      To test the quality of air, put the RUN / SET switch in the SET (down) position. 

 

 

      Check if there is any oil or moisture in the air.

   

6   

§3 Installation 

3. 1 Unpacking 

Use the packing lists to identify and account for each item. 

1.

 

Inspect each item for possible shipping damage. If damage is evident, contact your distributor and / or 
shipping company before proceeding with the installation. 

2.

 

When using forklift, its arm length must be long enough to reach the outside so as to ensure lifting 
safely. 

3.

 

The movement may bring the potential danger or substantive hazard, so please make sure that the 
machine is on the safe position before using. 

3.2 Input Power Connections 

Supply input connection of CUT 100 power is shown as the 
Fig3.1.

 

1.

 

Check your power source for correct voltage before plugging in 
or connecting the unit 

2.

 

Power Cord and Plug This power supply includes an input power 
cord and plug suitable for 380V AC 3 - Phase input power. 

3.

 

If the power supply voltage continually goes beyond the range of 
safe work voltage range, it will shorten the welder life-span. The 
following measures can be used: 

l

 

Change the power supply input. Such as, connect the welder with 
the stable power supply voltage of distributor; 

l

 

Reduce the machines using power supply in the same time; 

l

 

Set the voltage stabilization device in the front of power cable 
input. 

3. 3Gas Connections 

1.

 

Connecting Gas Supply to Unit 
Connect the gas line to the inlet port of the gas filter on the rear panel. 

2.

 

Check Air Quality 
To test the quality of air, put the RUN / SET switch in the SET (down) position, check if there are Any 

oil or moisture in the air. 

Live wire

Earth wire

3

380V

Power 

cable

Rear panel

Distrubutor

Earth wire

Live wire

Power 

input

Power 

switch

Power 

cable input

Fig 3.1 the connect method of 
the main supply 

   

STEALTH DIGI-CUT 100 CNC

8

Fig. 3.1 Correct method
of main supply

Summary of Contents for 9032H

Page 1: ...Part No 9032H DIGI CUT 100 CNC OPERATOR S MANUAL...

Page 2: ...al completely before attempting to use this equipment Save this manual and keep it handy for quick reference Pay particular attention to the safety instructions provided for your protection Contact yo...

Page 3: ...8 3 3 GAS CONNECTIONS 8 4 OPERATION CONTROL AND CONNECTORS 9 4 1 CUTTING PREPARATION 10 4 2 CUTTING OPERATION 10 4 3 ALARM INDICATOR 11 4 4 ABOUT THE CUT VOLTAGE DIVIDER 11 5 MAINTENANCE AND TROUBLESH...

Page 4: ...ions that may i function of cardiac pacemakers hearing aids or other electronic health equipm near plasma arc cutting applications should consult their medical health qualifi manufacturer of the healt...

Page 5: ...rn your skin The plasma arc process produ violet and infra red light These arc rays will damage your eyes and burn your skin if you are not To protect your eyes always wear a cutting helmet or shield...

Page 6: ...by inverter device discrete IGBT after reducing voltage by medium transformer the main transformer and rectified by medium frequency rectifier fast recovery diode and is outputted by inductance filter...

Page 7: ...nformation 2 2 Features 2 3 1 IGBT parallel balanced current technology and digital control technology 2 3 2 Wider input voltage flexibility provides peak performance power under variable conditions 1...

Page 8: ...1Unpacking Use the packing lists to identify and account for each item 1 Inspect each item for possible shipping damage If damage is evident contact your distributor and or shipping company before pr...

Page 9: ...oisture in the compressed air 13 Power cable connect to the appropriate power supply 14 Power switch turn on or off the power source 4 1LayoutOfTheFrontAndRearPanel Fig 4 1 schematic drawing of the fr...

Page 10: ...s and loosen the trigger quickly the gas stops you can then hold down the trigger to restart the machine 4 2 Cutting Operation 8 4 2CuttingPreparation 1 Tightly connect the power cable to electrical s...

Page 11: ...ed with an optional factory installed four position voltage divider that is designed to be safely connected without tools The built in voltage divider provides a scaled downarc voltage of 20 1 30 1 40...

Page 12: ...computerproducts Note The cover on the machine interface receptacle prevents dust and moisture from damaging the receptacle when not in use This cover should be replaced if damaged or lost Installatio...

Page 13: ...Turn OFF the power supply and disconnect the power cord 2 Remove the power supply cover 3 Locate the voltage divider DIP switches on the left side of the power supply Shift and Scale Selection Dial Sc...

Page 14: ...t properly installed Turn off the power source and install the shield cup securely Turn on the power source 5 1 4 The temperature indicator lights up after the machine has only been on for a short tim...

Page 15: ...echnician repair it 5 2 4 Arc shuts off during operation and will not restart when torch is triggered 5 2 4 1 Power Supply is overheated OC OT lamp lit Let unit cool down for at least five minutes Ens...

Page 16: ...cutting speed 5 3 3 3 Excessive oil or moisture in torch Hold torch 3 mm from clean surface while purging and observe oil or moisture build up do not activate torch If there are contaminants in the g...

Page 17: ...17 STEALTH DIGI CUT 100 CNC 6 MAIN ELECTRICAL DIAGRAM Appendix 1 Electrical principle drawing...

Page 18: ...SE 9030H 9032H 09 REAR PANEL 9032H 13 BASE 9032H 22 FRONT PANEL 9032H 25 CENTRAL SOCKET USE 9030H 17 9032H 27 KNOB USE 9000H 33 9032H 29 FRONT PCB 9032H 31 CONTROL PCB 9032H 33 SOLENOID VALVE 9032H 38...

Page 19: ...STEALTH DIGI CUT 100 CNC 19...

Page 20: ...STEALTH DIGI CUT 100 CNC Specialised Welding Products Ltd Unit 1 Farringdon Industrial Centre Farringdon Nr Alton Hampshire GU34 3DD UK tel 44 0 1420 588180 fax 44 0 1420 588184 email sales swp uk net...

Reviews: