Swimming Starting Block / OSB 14
Version 1.4
3454.519.02
Page 5
2.2 Fixation of the starting block
To ensure proper functioning of the OSB14 starting block system, the fixation must be
absolutely rigid.
2.3 Drilling and mounting of the OSB14
Put the drilling gauge (1) on the border of the swimming pool and mark the 4 Ø5 holes of the gauge
with a Ø5 drill (2).
Drill the 4 holes respectively with drills
5,
10 and
16mm (2).
Minimal depth: 90mm, maximal depth: 95mm
1. 3454.074 Drilling gauge
2. 9051.9803 Drill
5
9051.9008 Drill
10
9051.9814 Drill
16
3. 9039.8582 Pegs M8 x 90 (4x)
As per instruction manual 3393.505 Preparing the drillings, push the pegs M8 (3) in the
16
holes and put the OSB14 starting block on the 4 fixation points.
Fix the base with the 4 screws M8 x 45 (6) and the 4 washers M8 x 30 (4).
If the space it’s too small,
use the 4 washers M8 x 24 (5).
4. 3454.032 Inox washer A4 M8
30 (4x)
5. 3454.034 Inox washer A4 M8
24 (4x)
6. 3454.037 Screws A4 M8 x 45 (4x)
2.4 Drilling and mounting of the Deckplate
For fix cabling, a hole with Ø120 - 122mm at 238mm away from
the pool’s border must be foreseen
in order to provide space for the cables (the gauge has a hole Ø120mm).