![Swing-N-Slide TB 1408 Assembly Instructions Manual Download Page 10](http://html1.mh-extra.com/html/swing-n-slide/tb-1408/tb-1408_assembly-instructions-manual_1414322010.webp)
Fig. 5
E. Second Elbow and Slide Exit
1. Align the seams of the second Elbow Section to the First
Elbow Section as shown in (Fig. 5).
2. Secure in place as shown in (Fig. 5).
3. Attach exit section so that the Slide Base is level on the
ground, as shown in (Fig. 5a).
4. Use the Slide Bracket to determine an appropriate
location for the 4’’ x 4’’ x 66’’ Slide Support.
5. Dig a hole 18’’ deep aligned with the previously
determined location as well as located near the first
bend of the slide as shown in (Fig. 5b). Place the 4’’ x
4’’ x 66’’ Slide Support in this hole as shown and set in
place.
6.
dŝŐŚƚĞŶ
all slide bolts securely.
Fig. 5a
(1) 3/4’’ Bolt
(2) Flat Washer
(1) LocNut
Per Hole
(1) 3/4’’ Bolt
(2) Flat Washer
(1) LocNut
Per Hole
Fig. 5b
18’’
Ground Level
4’’ x 4’’ x 66’’
Tunnel Twister Assembly Instructions
10