Swing-N-Slide PB 9242N Assembly Instructions Manual Download Page 35

FLUSH

Fig. 25

¶¶/DJ6FUHZV

per bracket

´

´

Fig. 25a

 1. 

Attach the Monkey Bar Frame to the Monkey Bar Ladder as shown in 

(Fig. 25)

.

 2. 

'LJ¶¶GLDPHWHUKROHV¶¶GHHSDWWKHORFDWLRQVVKRZQLQ

(Fig. 25b)

.

 3.  

Attach the Monkey Bar Ladder to the unit as shown in 

(Fig. 25a) 

and 

(Fig. 25b)

Pre-Drill

 

Note: 

7RSUHYHQWZRRGIURPVSOLWWLQJSUHGULOOWKHKROHVIRUWKH¶¶

 

/DJ6FUHZV8VHD¶¶GULOOELW GULOOWRDPD[LPXPGHSWKRI¶¶

 4.  

Level the assembly, fill in holes and compact earth around posts.

Fig. 25b

FLUSH

¶¶

¶¶

´

¶¶'LDPHWHU

FLUSH

1/4’’ Flat washers 

(x24)

¶¶:DVKHUV

per screw

¶¶/DJ

Screws

per bracket

¶¶:DVKHUV

per screw

¶¶

1-1/2’’ Lag screw 

 - Gold Coating (x12)

Pre-Drill To 
Minimimize 

Splitting

Summary of Contents for PB 9242N

Page 1: ...ORE BEGINNING ASSEMBLY Please make sure all lumber hardware and accessory parts are accounted for If you are missing anything please DO NOT RETURN to the store where purchased Please call our Customer...

Page 2: ...EJKNFTGP PQV VQ ENKOD YJGP VJG GSWKROGPV KU YGV 5NKRRGT UWTHCEGU OC ECWUG C JC CTF 8GTKH VJCV UWURGPFGF ENKODKPI TQRGU EJCKP QT ECDNG CTG UGEWTGF CV DQVJ GPFU 8GTKH VJCV UWURGPFGF ENKODKPI TQRGU EJCK...

Page 3: ...HQWPF UCPF CPF TGRCKPV WUKPI C PQPNGCFGF DCUGF RCKPV OGGVKPI VJG TGSWKTGOGPVU QH 4 JGEM CNN YQQF OGODGTU HQT FGVGTKQTCVKQP CPF URNKPVGTU 5CPF FQYP URNKPVGTU CPF TGRNCEG FGVGTKQTCVKPI YQQF OGODGTU 4GK...

Page 4: ...CN 6Q OCKPVCKP VJG TKIJV COQWPV QH NQQUG HKNN OCVGTKCNU OCTM VJG EQTTGEV NGXGN QP RNC GSWKROGPV UWRRQTV RQUVU 6JCV YC QW ECP GCUKN UGG YJGP VQ TGRNGPKUJ CPF QT TGFKUVTKDWVG VJG UWTHCEKPI Q PQV KPUVCNN...

Page 5: ...0 6 0 18 0 15 5 26 9 PLAYSET SAFETY ZONE 0 1 080 86 21 25 3 48 30 17 6 7 1 12 66 7 1 520 6 6 OF THE PLAY STRUCTURE 6 1 86 21 7 1 6 12 66 7 1 6 1 6 0867 9 0 1 080 5 1 2 29 7 3527 7 9 685 1 8 Minimum 10...

Page 6: ...REQUIRED DRILL 62 76 5 1 HAMMER 867 5 1 TAPE MEASURE HELPFUL ASSEMBLY INFORMATION It is important to ensure all lumber accessories and hardware is accounted for The following pages list the contents o...

Page 7: ...DVKHUV 22 RRG 6FUHZ 71 RRG 6FUHZV 4 DJ ROW 6 Fence Staple 41 ODW DVKHUV 3 Loc Nut 12 H HDG ROW 2 T nuts 6 7DUS DVKHU 2 3DQKHDG 6FUHZ 6 3DQKHDG 6FUHZ 12 Loc nut 12 H HDG ROW 1RW 8VHG 11 RRG RF DVKHUV...

Page 8: ...EMBLY INSTRUCTIONS 7 9 9 9 2 228 2 6 9 36 3 0 3 V 3 4 052 7 3 4 4 77w 37 3 0 02 53 4 7 2 4 A 6 4 3 6KHOI RF 8 3 UDS RF 4 3 6KHOI RF 2 Bracket R INTENDED FOR USE BY CHILDREN FROM AGES 2 10 YEARS FOR HO...

Page 9: ...Anchor It 4 Anchor It Straps 6 Climbing Rocks 1 LQG 5LGHU DQGOH 4 Quick Links 4 KDLQ 1 LQG 5LGHU 6HDW LQG 5LGHU 6ZLQJ weight limit OEV 6 Swing Hangers 3 8 DRILL BIT 5 Min LQGRZ 3DQH 67 6ZLQJ 6HDW LSS...

Page 10: ...1 x 3 1 2 x 17 SLIDE STAKE 2 PF 4982 1 x 3 1 2 x 9 1 PF 4976 3 4 x 3 x 47 1 2 2 PF 4983 5 8 x 3 1 4 x 40 1 2 2 PF 4986 5 8 x 3 1 4 x 29 1 2 4 PF 4985 5 8 x 3 1 4 x 8 7 PF 4346 1 x 5 1 2 x 47 1 2 2 PF...

Page 11: ...WR KHOS VHOHFW WKH FRUUHFW IDVWHQHU V IRU WKH lumber attachment you are making Each diagram will highlight the correct number of fasteners to use and where to attach them 5 4 Boards to 4 x 4 5 4 Boar...

Page 12: ...bracket Introduction to the Bracket system 1 ALWAYS 8VH ODJ VFUHZV RQ DOO EUDFNHWV 2 UDFNHWV FOLS WR HDFK RWKHU NEVER position in a non interlocking position NOTE 3 6 5 6 1 5 76 ONLY WHERE INSTRUCTED...

Page 13: ...et FLIP FRAME OVER FLUSH 2 ODJ VFUHZV Per Bracket DJ Screws per joint DO NOT USE LAG SCREWS HERE 8VH DJ 6FUHZV 2QO KHUH Brackets Attach 3 2 Lag screw x6 3 screws per joint 3 screws per joint NOTE 8SSH...

Page 14: ...screws per joint 2 1 2 screw 2 Lag screw x2 51 1 Avoid splitting your lumber by offsetting your VFUHZV DW OHDVW IURP edge 2 ODJ VFUHZV Per Bracket 3 Arch 3 screws per joint DJ DJ DO NOT USE LAG SCREW...

Page 15: ...r joint 2 ODJ VFUHZV Per Bracket 2 ODJ VFUHZV Per Bracket Double check to make sure structure is square 3 3 3 3 3 3 3 Center arch DJ DJ DO NOT USE LAG SCREW HERE FLIP FRAME 1 OVER BEFORE COMPLETING TH...

Page 16: ...V Per Bracket 3 screws per joint Double check to make sure structure is square SSUR Tip Flex brackets to make installation of HDVLHU 4 ODJ VFUHZV DJ DJ DO NOT USE LAG SCREW HERE 3 2 screws 2 screws 2...

Page 17: ...re they line up with the bracket holes then insert harware 3 Install remaining deck boards as shown in Fig 7b Note Screws at center will attach to center support 2 1 2 screw Fig 7a 2 screws per joint...

Page 18: ...Sw ing Beam 723 9 1 ULOO KROHV LQ 6ZLQJ HDP XVLQJ D ULOO LW DW HDFK location indicated in Fig 8 NOTE Use circled measurements ONLY LI XVLQJ 22 8 5 lumber to construct the Swing Beam A Frame Fig 8 A FR...

Page 19: ...p of the T nut A screwdriver may be used to twist the hanger as shown in Step 3 4 Orient swing hanger as shown in Step 4 8VH PP VFUHZV WR VHFXUH EHDP FODPS 5 Check hanger to ensure it does not spin 6...

Page 20: ...0 Fig 11 1 D RXW V DQG as shown in Fig 10 and Fig 11 2 Align EZ Frame Bracket with IDFH RI V DV VKRZQ LQ Fig 10 3 Secure EZ Frame Bracket with VFUHZV WR V making sure they are flush with each other as...

Page 21: ...1 2 screws Washer 1 WWDFK UDPH EHDP WR 6ZLQJ HDP XVLQJ KH EROW ZDVKHU DQG VFUHZV DV VKRZQ LQ Fig 12 2 Repeat on other bracket Tighten both hex bolts to flush with top of T nuts Fig 12 2 1 2 screw H HD...

Page 22: ...2 Lag screw x 8 each bracket 1 Position Split Brackets on Fig 13 2 LWK WKH KHOS RI RWKHUV OLIW UDPH and Swing Beam Assembly and center onto unit as shown in Fig 13 3 Secure as shown in Fig 13a Fig 13...

Page 23: ...1 Install barrier support boards as shown in Fig 14 Fig 14 4 VFUHZV 3 4 VFUHZV 2 1 2 screw 3 Pre Drill To Minimimize Splitting...

Page 24: ...t boards as shown in Fig 15 2 QVWDOO EDUULHU ERDUGV HYHQO spaced in the opening See Fig 15a Fig 15 3 2 VFUHZV per board 1 1 2 screw GAP BETWEEN BOARDS IS 2 1 8 2 VFUHZV per board 2 1 2 screw Fig 15a 3...

Page 25: ...Fig 16 1 Install window barrier boards as shown in Fig 16 1 1 2 screw 2 GHFN VFUHZV per joint FLUSH 3 3 3 3 2 GHFN VFUHZV per joint 2 GHFN VFUHZV per joint 2 GHFN VFUHZV per joint FLUSH...

Page 26: ...1 QVWDOO LQGRZ UDPHV DV VKRZQ LQ Fig 17 3 4 screw Fig 17 ODW HDG6FUHZV ODW HDG6FUHZV 1 2 5 0 6...

Page 27: ...Fig 18 1 1 2 screw 1 QVWDOO 5RFN DOO EDUULHU ERDUGV DV VKRZQ LQ Fig 18 2 VFUHZV per joint NO GAP 3...

Page 28: ...DFK UDPH 6XSSRUW RDUGV DV VKRZQ LQ Fig 19a 3 Attach Decorative Support Board as shown in Fig 19b 4 Attach A Frames together as shown in Fig 19c x2 3 2 VFUHZV per joint 2 VFUHZV per joint 3 2 1 2 screw...

Page 29: ...assembly to unit as shown in Fig 19e Note Secure back side of roof to unit by inserting screws through the slots in the brackets 2 1 2 screw Fig 19d 2 VFUHZV per joint 2 VFUHZV per joint Secure roof...

Page 30: ...3 1 2 60 96 12 1 4 12 1 4 65 1 2 77 3 4 90 1 8VH D GULOO ELW WR GULOO D KROH WKURXJK WKH FHQWHU RI WKH beam at each location shown in Fig 20 ULOO Hole Accessory Beam 723 9 Fig 20...

Page 31: ...LQWR EUDFNHWV DV VKRZQ LQ Fig 21 and Fig 21a 2 Secure brackets Fig 21b 3 WWDFK DFFHVVRU WR EDVH ERDUG as shown in Fig 21 Fig 21b Fig 21 Note ULOO ROHV LQ before mounting 4 ODJ VFUHZV 4 ODJ VFUHZV per...

Page 32: ...BEFORE Drilling Holes Fig 22a NO MORE THAN A 3 7 1 723 2 52 1 27720 2 NOTE 52 76 81 5 5 76 FLUSH 81 5 9 3 VFUHZV per joint 1 Mark locations of Climbing Rocks RQ WKH OLPELQJ DOO LQ D SDWWHUQ that will...

Page 33: ...P VSOLWWLQJ SUH GULOO WKH KROHV IRU WKH DJ 6FUHZV 8VH D GULOO ELW GULOO WR D PD LPXP GHSWK RI 2 5HYHUVH GLPHQVLRQV IRU WKH EUDFNHWV RQ WKH RSSRVLWH OHJ DQG UHSHDW VWHS PP screws per bracket Lag screws...

Page 34: ...l Note To prevent wood from splitting pre drill all holes for the Monkey Bar Rungs DQG UDFNHWV 8VH D GULOO ELW GULOO WR D PD LPXP GHSWK RI WKH OHQJWK RI WKH Lag Screw used DJ screws per bracket DJ scr...

Page 35: ...o the unit as shown in Fig 25a and Fig 25b Pre Drill Note 7R SUHYHQW ZRRG IURP VSOLWWLQJ SUH GULOO WKH KROHV IRU WKH DJ 6FUHZV 8VH D GULOO ELW GULOO WR D PD LPXP GHSWK RI 4 Level the assembly fill in...

Page 36: ...1 Secure Sandbox Bench as shown in Fig 26 2 1 2 screw Fig 26 3 Sandbox Bench 2 VFUHZV per joint FLUSH FLUSH...

Page 37: ...Tighten the threaded sleeve of the Security Link with a suitably sized wrench so that the seat is securely attached DQG WKH 6HFXULW LQN FDQQRW EH HDVLO ORRVHQHG 5HSHDW IRU VHFRQG FKDLQ 6HFXULW LQN DQG...

Page 38: ...DVKHU Panhead Screw Fig 28 1 0RXQW VDIHW KDQGOH LQ WKH 5RFN DOO RSHQLQJ DSSUR LPDWHO DERYH WKH GHFN surface Fig 28 2 Reference Fig 28a for Safety Handle placement Safety Handle Deck Surface Fig 28a...

Page 39: ...RSH XQGHU WKH Then thread the rope through both staples Double the rope back on itself and through the first staple Pull the rope tight and secure in place by pounding staples in place See Fig 29b 4 5...

Page 40: ...red in the provided opening as shown in Fig 30 2 3UHSDUH D OHYHO DUHD RI JURXQG ZKHUH WKH ERWWRP RI WKH VOLGH UHVWV EHORZ JUDGH Fig 30a 3 0DUN ZKHUH WKH VOLGH V ERWWRP PHHWV WKH JURXQG DQG GULYH D VWD...

Page 41: ...FOR USE BY CHILDREN FROM AGES 2 10 YEARS FOR HOME RESIDENTIAL USE ONLY DISE ADO PARA SER USADO POR NI OS ENTRE 2 Y 10 A OS DE EDAD PARA USO EN EL HOGAR USO RESIDENCIAL NICAMENTE R SERV L UTILISATION...

Page 42: ...QJWK RI FKDLQ DV VKRZQ LQ Fig 32a Make certain the Quick Link is positioned as shown 3 8VLQJ WKH 4XLFN LQN DWWDFK HDFK OHQJWK RI FKDLQ WR WKH FRUQHUV RI RXU VZLQJ as shown in Fig 32b Make certain Quic...

Page 43: ...of your activity FHQWHU DW WKH ERWWRP RI WKH OHJV RQ VZLQJ VHWV DQG WZLVW WKH DXJHU VW OH VWDNHV LQWR the ground until only the loop is exposed 3 Place the metal strap through the loop of the Anchor...

Page 44: ...Call our Customer Support Representatives 1 800 888 1232 Available Monday Friday 7am 5pm CST HHNHQG VXSSRUW DYDLODEOH SULO WKURXJK XO Technical support from experienced Swing N Slide customer service...

Reviews: