background image

GB.FUNKMIRU.121204

Swegon reserves the right to alter specifications.

www.swegon.com     5

4.3. MIRU Control and TBLZ-1-25-2  
outdoor/room temperature sensor

Install the TBLZ-1-25-2 temperature sensor; see separate 
installation instructions.

Connect the 2-wire communication cable having min. per-
missible cross-sectional cable area of 0.5 mm² and a max. 
permissible length of 100 meter. See illustration.

20

21

Control circuit card, MIRU Control

Temperature sensor

TBLZ-1-25-2

Max. permissible length: 
100 m  
Min. permissible cross-sec-
tional cable area: 0.5 mm²

4.4. MIRU Control and  
GOLD air handling unit

This section is only of interest if you are wiring electrical 
connections to the GOLD air handling unit.

The TBLZ-1-64 connection kit accessory is required. The 
connection kit contains a cable adapter and a modular 
cable. 

Install the cable adapter on the DIN rail inside the electrical 
cubicle of the GOLD unit or on another appropriate loca-
tion near this cubicle. 

Connect the modular cable between one of the modular 
connections on the cable adapter and one of the modular 
connections marked ”Internal EIA-485” on the control 
unit inside the GOLD unit. See illustration.

Connect the 3-wire cable between MIRU Control and the 
GOLD air handling unit. 

A twisted-pair cable is recommended. 

Connect the cable to terminals 8 (A), 9 (B) and 10 (GND) 
on the control circuit card inside the MIRU Control unit. 

Connect conductor A to terminal 4 on the cable adapter, 
conductor B to terminal 3 and GND to terminal 1. See 
illustration.

If more than one MIRU Control unit are to be wired to 
one GOLD unit, see Section 4.1 MIRU Control to GOLD in 
separate MIRU Control installation instructions.

GOLD Control unit

Cable adapter

Modular cable

Control circuit card, 
MIRU Control

Wiring terminal, cable adapter

1

2

3

4

A B GND A B

-

-

-

GND

8 9 10 11 12 13 14 15 16 17 18 19 20 21

STOP

LS

HS

TEMP

INT.BUS(FAN)

EXT.BUS(BMS)

TERM.ON OFF

Summary of Contents for MIRU Control

Page 1: ...l via Modbus 2 Material Specification Control of MIRUVENT fan via MIRU Control MIRU Control equipment TBMZ 11 MIRUVENT fan with type code MIRU x xx xx 3 0 or MIRU x xx xx 1 x x model and size codes Pr...

Page 2: ...tions cable not included in supply 3 wire Twisted pair cables are recommended If shield is to be used the shield must be con nected to the AHUs roof fans chassi and not connected to MIRU Control not i...

Page 3: ...requency inverter Place the upper section in the groove designed to receive it in the lower section Connect the communication cable to terminals A B and GND next to the Bus marking See illustration MI...

Page 4: ...white tapping to pressure port on the pressure sensor Set the pressure sensor function selector switch to position 0 See illustration Connect the modular cable to an optional modular con nection in th...

Page 5: ...e DIN rail inside the electrical cubicle of the GOLD unit or on another appropriate loca tion near this cubicle Connect the modular cable between one of the modular connections on the cable adapter an...

Page 6: ...ld be set to the ON position See illustration If several MIRU Control units are connected to the same GOLD unit the MIRU Control that is last in the communi cation loop should have its jumper JP2 TERM...

Page 7: ...y setting m s Fan regulation control MIRU Control is factory preset for pressure regulation Press reg sensor ON Pressure regulation requires connection of a pressure sensor set for pressure regulation...

Page 8: ...see menu 2 10 MIRU Control unitsMax 10 units MIRU Control can be connected to one GOLD unit If two to ten MIRU Control units are connected to one GOLD unit the Modbus ID for each MIRU Control must be...

Page 9: ...er to be able to start the fan Operating times via the Miru Control panel Set the current date and time under Time Date in the main menu Four different time channels can be set under Time chan nel If...

Page 10: ...sed by the corresponding rate If EA is selected the extract airflow in the GOLD unit will be decreased by the corresponding rate Under Miru Control Time channel you must select the following for each...

Page 11: ...ncy inverter 5 flashes Phase failure on supply voltage phase lacking 6 flashes Fluctuating supply voltage between phases 10 flashes Communication failure between upper and lower sections 11 flashes Me...

Page 12: ...ng is correct the lower LED on the pressure sensor should be lit with a steady flow and the upper LED should be flashing No 4 PRESSURE SENSOR DEFECTIVE MIRU Control cannot establish correct communicat...

Reviews: