If your proposed installation details differ from
that shown here, please discuss this with the
authority having jurisdiction, referencing this
documentation.
Deviation from this drawing requires approval
of the relevant authority.
Connecting ductwork omitted for clarity.
Ductwork must be independently supported.
There must be an appropriate break-away
joint between the damper and the connecting
ductwork on both sides of the installation.
A minimum of 200mm between fire dampers
installed in separate ducts and 75mm between
fire damper and construction elements/edges
needs to be observed unless otherwise
specified in the drawing.
Installation Detail
³
³
IF YOUR PROPOSED
INSTALLATION DETAIL DIFFERS
FROM THAT SHOWN, YOU MUST
DISCUSS THIS WITH THE
BUILDING CONTROL AUTHORITY
(BCA), REFERENCING THIS
DOCUMENT AND THE
ASSOCIATED FIRE TESTS,
ASSESSMENTS AND OTHER
DOCUMENTS SHOWN BELOW.
DEVIATION FROM THIS DRAWING
REQUIRES THE APPROVAL OF
THE RELEVANT AUTHORITY.
VERTICAL BLADES;
Damper can be installed with the blades in the
vertical orientation with the actuator mounted at
either the top or bottom refer to drawings for cleat
locations;
DWFX-C actuator at top = AA-SS-2000
DWFX-C actuator at bottom = AA-SS-2001
D
EC1770
MJB 20-02-18
Damper Size Range (mm)
VERTICAL APPLICATION
SMOKE SHIELD DWFX-C IN
PLASTERBOARD WALL
200 x 200 to 1000 x 1000
E
EC1830
RTC 20/03/18
F
ECN1999
MJB 04-11-20
© Swegon Air Management Limited
South Street, Whitstable, Kent CT5 3DU
Tel: +44 (0)1227 276100
Email: [email protected]
www.swegon.com/uk
Please refer to the DoP
for latest classifications
for CE/UKCA
compliance and the
Installation, Operation
and Maintenance Guide
SCAN ME
G
ECN2227
JPM 13/04/22
Vertical Damper Installation in a
Plasterboard Wall with Pattress
Actionair SmokeShield PTC - [AA/F 10708] (Illustrated
above)
Actionair FireShield - [AA/F 10709]
Installation Method
1. Fit track (of partition) to the ceiling.
2. Suspend the damper from the ceiling through the
centre of the partition ceiling track using 10mm stud-
ding drop rods.
3. Frame out the damper using tracks and studs lined
with board. This is done with a lined track above the
damper crossing between the nearest two full height
studs, two vertical lined studs as close to the damper
as possible (outside the cleats) from the top cross track
to the floor and a lined cross track below the damper
between the two vertical studs.
4. Build the partition to the track and stud framework,
between 50 mm - 60 mm to the damper.
5. Insulate the wall with mineral/stone wool (if required).
6. Seal the damper to the partition with intumescent
sealant and add pattresses to both sides down to the
damper spigot, seal to the damper spigot with intu-
mescent sealant.
7. Finish the wall as standard practice.
8.
A minimum of 200 mm between fire dampers installed
in separate ducts and 75 mm between fire damper and
a construction element (wall/floor).