Section II: Installation
2.0.INS.SL-214
EHV INSTALLATION w/ U-LOCK (OPTION)
1. Review all directions and diagrams provided before starting the
E
lectric over
H
ydraulic
V
alve
Installation.
2. Mount the 22P91 EHV to the hoist’s
Main Frame and attach all hoses, hose
clamp assemblies and fittings as
shown on
Pg. 6-12
(also see
Illustrations).
Electric Over Hyd. Valve - SERVICE PARTS SL-214
ITEM
PART
#
QTY
DESCRIPTION
1
12P53
1
Hose Assy 21 08-08FJ/08FJ45
2
12P59
1
Hose Assy 20 08-08FJ/08FJ45
3
13P29
1
Hose Assy 75 08-08FJ/08FJ45
4
13P35
1
Hose Assy 72.5 08-08FJ/08FJ45
5
13P81
1
Hose Assy 77.5 08-08FJ/08FJ45
6
13P88
1
Hose Assy 82 08-08FJ/08FJ45
7
22P82
1
Solenoid Operated Valve, Motor
8
22P83
2
Solenoid Operated Valve, Cylinder
9
22P84
1
Relief Valve Cartridge, 3250
10
22P85
1
Dump Valve
NOTE:
THE FIGURES BELOW DO NOT NECESSARILY
DEPICT YOUR HOIST AND ARE ONLY MEANT
TO ILLUSTRATE ROUTING OF THE HYDRAULIC
LINES FROM THE VALVE TO THE CYLINDERS
2-10
Summary of Contents for SL-214
Page 1: ...Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 214...
Page 2: ......
Page 30: ...This Page Intentionally Left Blank...
Page 40: ...This Page Intentionally Left Blank...
Page 46: ...This Page Intentionally Left Blank...
Page 51: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 39...
Page 52: ...This Page Intentionally Left Blank...
Page 56: ...This Page Intentionally Left Blank...
Page 64: ...This Page Intentionally Left Blank...
Page 78: ...This Page Intentionally Left Blank...
Page 90: ...This Page Intentionally Left Blank...
Page 105: ......
Page 106: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000...