Section II: Installation
2.0.INS.SL-214
AIR OR CABLE CONTROL INSTALLATION w/ U-LOCK (OPTION)
The Universal Body Lock (U-Lock) can be installed with a standard 3-section valve and
operated from the cab (see
Pg. 6-10
for routing). A separate indicator light and harness will be
provided to be installed in the truck cab. This will notify the operator when the U-Lock has been
engaged or disengaged.
1.
Review all directions and diagrams provided before starting installation.
2.
Mount valve to the hoist’s Main Frame and attach all hoses, hose clamp
assemblies and fittings as shown on
Pg. 6-10.
3.
Mount Indicator Light Box in the truck cab where it will
be clearly visible to the operator.
4.
Route Indicator Light and Harness (
Pt. No.
40P60
) from the truck cab to the U-Lock
cylinder.
5.
Hardwire or plug in provided 12V
adapter for indicator
light.
2-7
Summary of Contents for SL-214
Page 1: ...Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 214...
Page 2: ......
Page 30: ...This Page Intentionally Left Blank...
Page 40: ...This Page Intentionally Left Blank...
Page 46: ...This Page Intentionally Left Blank...
Page 51: ...Section II Installation Accessories 2 8 INS ACC LEDLB 2 39...
Page 52: ...This Page Intentionally Left Blank...
Page 56: ...This Page Intentionally Left Blank...
Page 64: ...This Page Intentionally Left Blank...
Page 78: ...This Page Intentionally Left Blank...
Page 90: ...This Page Intentionally Left Blank...
Page 105: ......
Page 106: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000...