Page 2 of 7
28JUL09
11.
Once the overall hose length is adjusted, install between the C.V.S. hydraulic valve and
the hydraulic tank fittings (See drawing 90H84), and tighten.
12.
Remove both the hydraulic hose [Part No. 12P55] that connects from the upper bulkhead
fitting inside the mainframe to the jib lockout valve [Part No. 21P28] and the 90
degree hydraulic fitting [Part No. 11P23] installed into the top side of the jib lockout
valve (See drawing 90H73).
13.
Replace with hydraulic fittings [Part No. 12P69 (Qty: 2) & 13P03], hydraulic hose [Part
No. 11P98], and relief valve assembly [Part No. 21P93] and tighten (See drawing
90h84).
14.
Refill hydraulic tank to proper fluid level.
15.
Verify that the C.V.S. is operating properly. Start the truck, engage the P.T.O., and then
retract the jib cylinder full stroke. Next, while extending the jib cylinder back out have
someone push or rotate the C.V.S. lever arm forward (toward the back of the truck
cab). The C.V.S. is operating properly when the jib cylinder stops extending by
rotating the C.V.S. lever arm forward.
16.
Containers to be used in conjunction with the C.V.S. need modified by adding a stop tab
to the side of the container longsill (See drawing S-878). Dimensions given are a
recommendation only. When modifying containers for use with the C.V.S. it is the
primary responsibility of the installer to verify that adequate rear end overhang and
full latch plate engagement into body locks exists for each container.
Summary of Contents for SL-180
Page 1: ...Model SL 180 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 7: ...INTRODUCTION ...
Page 14: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 15: ...INSTALLATION ...
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 48: ...Page 3 of 7 28JUL09 ...
Page 49: ...Page 4 of 7 28JUL09 ...
Page 50: ...Page 5 of 7 28JUL09 ...
Page 51: ...Page 6 of 7 28JUL09 ...
Page 52: ...Page 7 of 7 28JUL09 ...
Page 55: ...10 05 09 REAR LIGHT BAR ASSEMBLY 51H68 ...
Page 58: ...10 05 09 ...
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 65: ...OPERATION ...
Page 74: ...MAINTENANCE ...
Page 76: ...SL 180 MAI 4 2 07 2009 ...
Page 88: ...PARTS LIST ...
Page 89: ...12H30 REV B SL 180 SWAPLOADER HOIST BASE ASS Y 2 1 2 3 3 1 5 ...
Page 90: ......
Page 92: ......
Page 100: ...OPTIONS ...
Page 105: ...HOIST INSTALLATION KIT EHV SL 180 12H81 REV A ...
Page 106: ...EHV SUB ASS Y PUMP CIRCUIT 100 SERIES 91H22 ...
Page 107: ...EHV SUB ASS Y CHASSIS TANK CIRCUIT 100 SERIES 91H23 ...
Page 108: ...EHV SUB ASS Y VALVE HOSE CIRCUIT SL 180 91H27 REV A ...