3.
Installation
3.1. Installation Checklist
On-site require
-
ments
AC variant: 100–240 VAC (
10%), 50/60 Hz (
5%)
DC variant: 10–36 VDC
Power consumption: 35 VA maximum.
Protective earth connection required.
Sample line with sufficient sample flow and pressure (see
).
Installation
Mounting of Instrument Panel, p. 20
.
Install the Constant Head, p. 21
Connect Sample and Waste, p. 22
Electrical
Wiring
Connect all external devices like limit switches, current loops and
pumps.
Install the 2nd Sample Stream Option, p. 23
Install the AMI Sample Sequencer, p. 26
Connect the power cord, see
Reagents
Refill or replace Reagents, p. 49
Insert suction lances, see
Power-up
Activate the Peristaltic Pump, p. 37
Switch on power.
Instrument
Setup
Program all parameters for external devices (interface, recorders,
etc.). Program all parameters for instrument operation (limits,
alarms, measuring interval).
Run-in period
Let the instrument run continuously for 1 h.