Suzuki U4-60 Assembly Manual Download Page 1

MODEL U4-60 SUZUKI SERIES 60 HP 

 ASSEMBLY INSTRUCTIONS 

57.4 CU. IN. STARTING 2010 

 

 

1

 
1.  Place the motor on the transom of your boat so that it is mounted vertically, in the normal fashion.  

Disconnect the gearshift rod coupling near the gearbox and remove the bolts holding the gearbox to the 
exhaust housing.   Remove the gearbox assembly. 

 
2.  Remove the water pump assembly from the gear box, including the lower stainless steel plate and impeller 

drive key.   

 
3.  Next, install the jet pump driveshaft assembly into the spiral pump housing, locking it in place with two #10-

24 fil head screws and spring lock washers. 

 
4.  Install the water pump assembly on top of the 3/4 inch thick aluminum adapter and stainless steel plate.  Be 

sure also to install the water pump impeller and drive key removed from the propeller drive.  Lock in place 
using four 1/4-20 x 2 1/4 bolts and lock washers.  Grease the threads.  8 Ft-lbs. 

 
5.  The large 3/4 inch adapter plate is attached to the exhaust housing to hold the jet drive.  The tube guides the 

disconnected shift rod.  Two 6 x 16 mm dowels locate the plate and six M8 x 30 mm hex head bolts and lock 
washers secure it.  Grease the bolt threads and the threaded end of the shift rod where it slides in the tube.  12 
ft-lbs. 
 

6.  Next, attach the jet drive to the motor.  Two 3/16 x 1/2 dowel pins center the jet drive on the adapter plate.  

Four 5/16-18 x 2 3/4 bolts and lock washers from below and one 3/8-16 x 1 1/4  bolt from above rear are 
used.  Grease the bolt threads, driveshaft spline generously, rubber water tube sleeve and guide the jet into 
place.  Tighten the 5 bolts, 5/16 bolts to 12 ft-lbs and 3/8 bolt to 22 ft-lbs. 

 
7.  Next, install the impeller.  Grease the shaft threads, key and impeller bore.  Place the plastic sleeve inside the 

impeller; hold the key in the nose of the impeller with your forefinger and slide onto the driveshaft.  Install 
the shim washers, torsional damper and nut retainer on the shaft, and bring the nut up snug by hand.  

 
     Place the liner wear ring in position and observe the clearance between the impeller blade edge and the 

intake liner. 

 
     When, after use in sand and gravel, the blade clearance becomes more than about 1/32” between the                    

impeller edge and the water intake liner, one or more of the shim washers can be transferred from the bottom 
stack to the top of the impeller, which moves the impeller down into the tapered casing to reduce the 
clearance. 

 
     Shims should not be used above the impeller on new installations where no wear has occurred unless the 

blade clearance exceeds 1/32 inch.  Insufficient blade clearance will do more harm than good from any 
performance gains it might provide. 

       
      When the impeller clearance is satisfactory, bump the nut up tight with a wrench.  If the ears of the retainer 

do not line up with the flats on the nut, spin the nut off, turn the retainer over, and tighten the nut again.  In 
one of these two positions you will have alignment and can fold the ears up against the nut to retain it.  The 
flat in the retainer is angled to the ears to allow this. 

 
8.  Place the intake casing in position with the lower end at the rear and tighten the six 1/4-20 fiber lock nuts.  

No lock washers are used. Grease the threads.  See the diagram on page 3. 

 
 9. If your jet drive was ordered for use with a steering tiller handle, see the attached shift cable assembly      

instruction page for installing shift cable #2039. 

Summary of Contents for U4-60

Page 1: ...lts 5 16 bolts to 12 ft lbs and 3 8 bolt to 22 ft lbs 7 Next install the impeller Grease the shaft threads key and impeller bore Place the plastic sleeve inside the impeller hold the key in the nose o...

Page 2: ...h at a time to obtain the best results The motor has four sets of upper mounting holes You will use one set to begin with Mark pencil lines on the boat transom through the other sets Then if you wish...

Page 3: ...TTING MOTOR HEIGHT CAUTION When starting the engine for the first time watch to see that the cooling water comes out of the small hole at the rear side of the engine just below the power head This is...

Page 4: ...ht to remove any play between the impeller and shaft Note the position of the impeller shim washers and replace them in the same order REVERSE GATE MECHANISM Occasionally check adjustment of the gate...

Page 5: ...MODEL U4L 60 ANODE KIT 1693...

Page 6: ...552 GREASE 10 OZ TUBE NO 630 AA 63 1 805 NUT KEEPER MED PKG 2 PER BAG 22 1 1175 REVERSE GATE MEDIUM 64 1 22 1 SHAFT NUT 5 8 18 BRASS 23 2 535 NYLINER 3 8 ID X 11 16 1447 04 INTAKE ASSY 6 1 8 WITH GRI...

Page 7: ...SUPREME 2 1 156 BRACKET CABLE SUPT OMC MORSE 3 2 542 SHIM MORSE A035777 4 2 543 CLAMP CHRYS 154317 5 2 561 1 FIL HD SLOTTED 10 24 X 3 4 6 2 635 1 4 WASHER AN960C416 7 2 572 BOLT HEX HD 1 4 20 X 5 8 8...

Page 8: ...e the shift handle in forward solidly in the detent The reverse gate cam roller must be at the end of the slot in the cam If these conditions are not met slide the cable anchor bracket on the jet driv...

Page 9: ...ABLE ASSY SUZUKI BH STARTING 2009 SUZUKI BH STARTING 2009 SUZUKI U4L 60 STARTING 2010 2039 REMOVE NUT REF QTY PART NO DESCRIPTION 1 1 547 1 CABLE 4 1 2 FT MOR 33C SUPREME LONG 2 1 2036 CABLE END SUZUK...

Reviews: