
3-8 ENGINE
• Tighten the exhaust pipe nuts to the specified torque.
Exhaust pipe nut: 10 N·m (1.0 kgf-m, 7.0 lb-ft)
• Tighten the muffler mounting bolt to the specified torque.
Muffler mounting bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• After remounting the engine, inspect the lead wires and hoses
routing. (
7-14 to -18)
• Pour the specified engine oil. (
2-9)
• Pour the specified final reduction gear box oil. (
2-10)
• Perform the following adjustments:
* Drive chain slack (
2-15)
* Engine idle speed (
2-11)
* Throttle cable play (
2-10 to -11)
POWER REDUCTION SPACER
The power reduction spacer has been installed inside of the
movable drive.
REMOVAL
• Remove the left frame cover. (
5-4)
• Remove the CVT case cover. (
3-11)
• Remove the starter cup. (
3-11)
• Remove the fixed drive face. (
3-11)
• Remove the movable drive spacer
1
and power reduction
spacer
2
.
REMOUNTING
• Reinstall the movable drive in the reverse order of removal.
Do not remove the power reduction spacer until the
rider develops sufficient skills to operate LT-Z50
safety at the maximum speed with the power reduc-
tion system in place.
PartShark.com
877-999-5686
Summary of Contents for LT-Z50
Page 2: ...P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 15: ...P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 36: ...PERIODIC MAINTENANCE 2 21 P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...
Page 41: ...P a r t S h a r k c o m 8 7 7 9 9 9 5 6 8 6 ...