Sussman ES30A Installation, Operation And Maintenance Manual Download Page 11

11

26

4.7

17.8

9

13.7

20.1

18.75

21

25

19.5
24.5

14.5

1

9

8

5

6

7

4

4

1

7

10

11

2

3

2

3

4

5

6

8

9

10

11

12

13

14

SIDE VIEW

FRONT VIEW

ES 30A - ES36A - HP 30A Electric Steam Generator

Installation, Operation and Maintenance Manual

_____________________________________________________________________________

____________________________________________________

90229

Probe Plug

____________________________________________________

92830

On-Off Switch with Pilot Light

____________________________________________________

93806A

Strainer 1/4” HP30A

____________________________________________________

99007

Contactor, 60 AMP, 3 Pole 240V

____________________________________________________

99031

Water Solenoid 1/2”120V ES30A/36A

____________________________________________________

99032

Water Solenoid 1/2”240V ES30A/36A

____________________________________________________

99042

Water Solenoid 1/4”120V HP30A

____________________________________________________

99042C

Water Solenoid 1/4" 240V HP30A

____________________________________________________

99074-1

7

7

8

” Gauge Glass w/ (2) 99174C O-Ring

____________________________________________________

99075

Contactor, 60 amp; 3 Pole, 120V

____________________________________________________

99123

Strainer 1/2” ES30A/36A

____________________________________________________

99128R

Pressure Control Operating 0-100 PSIG

____________________________________________________

99130R

Pressure Control Hi Limit 0-100 PSIG
w/Reset Button on Rise

____________________________________________________

Spare Parts List

____________________________________________________

99136

Safety Valve 100PSIG, 1/2” NPT

____________________________________________________

99162

Check Valve 3/8” HP30A

____________________________________________________

99167

Check Valves 1/2” ES30A/36A

____________________________________________________

99173C

Gauge Valve Set

____________________________________________________

99178B

Drain Gate Valve 1/2” ES30A/36A & HP30A

____________________________________________________

99197

Pressure Gauge 160 PSIG, 2-1/2” NPT

____________________________________________________

99807F

1/4 Probe Rod 5-Inch

____________________________________________________

100706

8 amp Fuse

____________________________________________________

100412A

Liquid Level Control Board; 120V

____________________________________________________

100412C

Liquid Level Control Board; 240V

____________________________________________________

102124

Ball Valve Steam 3/8” HP30A

____________________________________________________

103036

Ball Valve Steam - 1” ES30A/36A

____________________________________________________

103540

Boiler Gasket Kit, 99096; 99547B, 99088
Gasket; Bolts & Compound

____________________________________________________

Item

Description

1

Steam Outlet

2

Gauge Glass Valves

3

Gauge Glass Tube

4

Water Feed Strainer

5

Water Solenoid Valve

6

Check Valve

7

Drain Valve

Item

Description

8

Safety Valve

9

Hi Limit Pressure Control

10

Operating Pressure Control

11

Pressure Gauge

12

On-Off Switch

13

Control Circuit Fuse

14

Access Panel

Component Identification Dimensional Information

(in inches)

ES 30A & ES 36A

HP 30A

Summary of Contents for ES30A

Page 1: ...pproving your generator It must be kept near the generator at all times KW Design Max Work Model Range Steam Rate BHP Pressure Pressure ________________________________________________________________...

Page 2: ...automatically opens to reduce pressure should excessive steam cause pressure build up STEAM PRESSURE GAUGE Allows visual observation of steam pressure over full range ENERGY SAVING AND MINIMUM MAINTEN...

Page 3: ...and N E C requirements following wiring diagram supplied Wire size specified adjacent to field wiring terminal block s Use 90 C copper wire only Purchaser should use a disconnect switch employing circ...

Page 4: ...ation Operation and Maintenance Manual _____________________________________________________________________________ 4 Factory Wiring Field Wiring NOTE See Boiler Nameplate for Input Requirements Wiri...

Page 5: ...ting pressure control to a low pressure setting Set hi limit control at 10 PS1G above that setting Switch boiler on to allow for steam pressure build up Pressure gauge reading will build and the opera...

Page 6: ...off the boiler switch unless further operation is desirable 6 If you have been supplied with a Manual Reset Low Water Control as required in some states the reset button on the control must be pushed...

Page 7: ...on terminals on element assembly are in line with previously disconnected wire leads to facilitate easy connections NOTE Observe markings on element flange Install element marking TOP on top 7 Use onl...

Page 8: ...both ends of the gauge glass Push both packings about an inch up the gauge glass 4 Gently insert one end of the glass into the top gauge fitting Keeping the glass inside the top fit ting gently rotate...

Page 9: ...e gauge glass daily keep maintenance records and conduct routine replacements DO protect glass from sudden changes in temperatures such as drafts water spray etc MAINTENANCE Examine the gauge glass re...

Page 10: ...RE FREQUENT BLOWDOWN IS REQUIRED RECOMMENDED LIMITS WITHIN A BOILER TOTAL DISSOLVED SOLIDS ppm 3500 TOTAL ALKALINITY ppm 850 SUSPENDED SOLIDS ppm 300 SILICA Si02 ppm 125 SULFITE SO3 ppm 25 50 PHOSPHAT...

Page 11: ...Rise ____________________________________________________ Spare Parts List ____________________________________________________ 99136 Safety Valve 100PSIG 1 2 NPT _____________________________________...

Page 12: ...PN 100600 1 17 A Division of Sussman Automatic Corporation 43 20 34th Street Long Island City NY 11101 718 937 4500 1 800 238 3535 Fax 718 937 4676 www sussmanboilers com Email seb sussmancorp com...

Reviews: