background image

With the brackets firmly fixed and level, the radiator is lowered directly 
onto the brackets. When commissioning your radiator on an indirect/
closed system we recommend using a suitable quality and quantity of  
mixed metal inhibitor to protect against scale & corrosion. 

Damage caused to systems not protected by a suitable inhibitor 
will not be covered by manufacturer’s guarantee.

You should have:

•   1 Radiator
•  4 Wall Brackets
•  1 Manual Airvent
•  4 Bushes with Gaskets
•  1 Blanking Plug
•  1 Diverter (for 1800mm vertical models only)

You will need:

•  Tape measure
•  Electric drill and bits
•  Spirit level
•  Bush spanner

3. Fit Diverter 

5. Hang & Commission

 Radiator

Technical Specifications

Materials

 

  

Aluminium.

Connections

     

   

½” flow and return.

Test pressure

 

   

9 Bar

Testing authority

 

  

EN442

Maximum operating pressure

 

6 Bar

Maximum working temperature 

110ºC 

Packaging

 

   

Wrapped in polythene & boxed.

You will have been supplied with at least four brackets (see drawing 
1 on other page and drawing B below). The brackets are typically 
positioned one section in from either end with extra brackets spaced at 
equal distances between these two (see drawing 2 on the other page).

Brackets should be fixed using suitable drill bit, screws and plugs.

PLEASE NOTE:

It is essential that all brackets are level and square prior to hanging the 
radiator to ensure a vertical alignment for connecting the pipework.
Mark and fix the 2 top brackets checking they are level. Hang radiator in 
position and mark the location of the 2 bottom brackets and fix in place.

All products must be inspected once removed 
from the packaging and your point of purchase 
notified within 28 days of delivery of any 
scratches, blemishes or other damage. Your point 
of purchase will then agree appropriate action.
Imperfect radiators should therefore not be 
fitted and we will not accept responsibility for 
replacement of scratched or damaged radiators 
once they have been fitted. This includes any 
consequential loss or cost of fitting. 
If we are not notified within 28 days of the date 
on the signed delivery note then it will be deemed 
that we have fully complied with our obligations 
and claims will not be considered. 
Failure to comply with any of the above may 
invalidate any claims. We recommend that after 
you check the product on delivery that it is stored 
in its packaging to prevent damage prior to 
installation, we cannot accept responsibility for 
items damaged after delivery.
For full details of our Terms and Conditions 
please visit www.supplies4heat.co.uk or call us 
on 01342 306880.

Terms & Conditions

This product is guaranteed for 10 years. As we are not the manufacturers of this product 
we will take all reasonable endeavours to make over to you the benefit of any warranty or 
guarantee given by the manufacturer.
The guarantees in all cases are subject to the products being installed in accordance with 
British and or European standards as well as these fitting instructions. The guarantees in all 
cases are restricted to the free of charge replacement or repair of the failed product only. 
Our liability will under no circumstances extend beyond the repair or replacement of the 
product supplied by us. Claims for either labour in replacement or damage to property are 
not admissible. Any goods that are returned, in the event of a problem, will belong to us.

Guarantees & Liabilities

A

B

PLEASE NOTE:

 To reduce the possibility of noise caused by rapid heating and cooling of 

aluminium radiators; adequate capacity for expansion must be provided within the overall 
heating system. Systems using micro bore pipework must have adequate pressure and flow 
rates for the number and style of radiators on the system.

www.supplies4heat.co.uk    01342 306880

A brand of                , Italy’s leading manufacturer of design led radiators.

2. Contents

4.Fix Brackets

Aluminium radiators which are 1800mm tall are supplied with 
a Spring Diverter, which is installed in the lower waterway at 
either end.

This is installed by pushing the cap firmly in the waterway until 
it locates against the barell nipple and is retained in place by 
the bush. The flow must enter this end first (please see drawing 
A below).

1. Unpack & Inspect

This product should have reached you in perfect condition. Please 
carefully unpack and inspect this radiator and all fittings. Your point 
of purchase must be notified of any shortages or damage within 
28 days of delivery. For further information please see terms and 
conditions on reverse.

Reviews: