S
UPER
S
ERVER 6123L-8R/6123L-iR User's Manual
2-4
NI
C
2
RE
SE
T
NI
C 1
Figure 2-2. Installing Rails to the Chassis
Installing the Outer Rails
Locate a pair of front (short) and rear (long) brackets that were included with
your rack mounting hardware. Note that the brackets are marked with up/front
arrows (front) and up/rear arrows (rear). Secure the front (short) bracket
(marked with the up/front arrows) to the outer rail with two M4 x 4 mm
roundhead screws. Locate the two buttons on the outer rail and attach the
rear (long) bracket to it by sliding the opening of the rear rail through the
button. Measure the depth of your rack and adjust the length of the rails
accordingly. Repeat the same steps to install the other outer rail on the
chassis. Secure both outer rail assemblies to the rack with M5 screws and
washers.
Summary of Contents for SuperServer 6123L-8R
Page 5: ...v Preface Notes ...
Page 10: ...SUPERSERVER 6123L 8R 6123L iR User s Manual x Notes ...
Page 18: ...SUPERSERVER 6123L 8R 6123L iR User s Manual 1 8 Notes ...
Page 23: ...2 5 Chapter 2 Server Installation Figure 2 3 Installing the Outer Rack Rails ...
Page 73: ...6 10 SUPERSERVER 6123L 8R 6123L iR User s Manual Notes ...