5-2
S
UPER
S
ERVER 6017R-TDLF User's Manual
5-2 Processor and Heatsink Installation
Notes:
•
Always connect the power cord last and always remove it before adding, re-
moving or changing any hardware components. Make sure that you install the
processor into the CPU socket before you install the CPU heatsink.
•
If you buy a CPU separately, make sure that you use an Intel-certifi ed multi-
directional heatsink only.
•
Make sure to install the serverboard into the chassis before you install the CPU
heatsinks.
•
When receiving a serverboard without a processor pre-installed, make sure that
the plastic CPU socket cap is in place and none of the socket pins are bent;
otherwise, contact your retailer immediately.
•
Refer to the Supermicro web site for updates on CPU support.
Installing an LGA 2011 Processor
1. There are two levers on the LGA
2011 socket. First press and re-
lease the load lever labeled 'Open
1st'.
2. Press the second load lever
labeled 'Close 1st' to release the
load plate from its locked position.
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
Press down on the lever labeled
'Close 1st'
Pull lever away
from the socket
Summary of Contents for SUPERSERVER 6017R-TDLF
Page 1: ...SUPERSERVER 6017R TDLF SUPER USER S MANUAL 1 0...
Page 5: ...v Preface Notes...
Page 14: ...1 6 SUPERSERVER 6017R TDLF User s Manual Notes...
Page 26: ...3 4 SUPERSERVER 6017R TDLF User s Manual Notes...
Page 46: ...4 20 SUPERSERVER 6017R TDLF User s Manual Notes...
Page 72: ...5 26 SUPERSERVER 6017R TDLF User s Manual Notes...
Page 82: ...6 10 SUPERSERVER 6017R TDLF Manual Figure 6 7 Removing Replacing the Power Supply...
Page 114: ...A 2 SUPERSERVER 6017R TDLF User s Manual Notes...
Page 118: ...B 4 SUPERSERVER 6017R TDLF User s Manual Notes...