Chapter 2: Server Installation
2-7
Figure 2-4. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. You should have two brackets in the rack
mount kit. Install these fi rst keeping in mind that they are left/right specifi c (marked
with "L" and "R"). Then, line up the rear of the chassis rails with the front of the
rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on
both sides (you may have to depress the locking tabs when inserting).
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that hold
the front of the server to the rack (see Figure 2-4).
Summary of Contents for AS-4021M-32R
Page 1: ...AS4021M 32R USER S MANUAL 1 0 ...
Page 5: ...v Preface Notes ...
Page 10: ...Notes x AS4021M 32R User s Manual ...
Page 16: ...1 6 AS4021M 32R User s Manual Notes ...
Page 30: ...3 4 AS4021M 32R User s Manual Notes ...
Page 62: ...5 28 AS4021M 32R User s Manual Notes ...
Page 72: ...6 10 SUPERSERVER 4021M 32R User s Manual Notes ...
Page 90: ...7 18 AS4021M 32R User s Manual Notes ...
Page 92: ...A 2 AS4021M 32R User s Manual Notes ...