Chapter 2: Server Installation
2-5
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack:
You should now have rails attached to both the chassis and the rack
unit. The next step is to install the server into the chassis. Do this by
lining up the rear of the chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on
both sides (you may have to depress the locking tabs when inserting).
See Figure 2-3.
When the server has been pushed completely into the rack, you should
hear the locking tabs "click". Finish by inserting and tightening the
thumbscrews that hold the front of the server to the rack.
other assembly to the other side of the rack, making both are at the exact
same height and with the rail guides facing inward.
Summary of Contents for SUPERSERVER 6010H
Page 1: ...SUPERSERVER 6010H USER SMANUAL Revision 1 1a SUPER...
Page 10: ...Notes SUPERSERVER 6010H User s Manual x...
Page 30: ...SUPERSERVER 6010H Manual 3 4 Notes...
Page 34: ...SUPERSERVER 6010H Manual 4 4 Notes...
Page 68: ...6 10 SUPERSERVER 6010H Manual Notes...
Page 106: ...SUPERSERVER 6010L Manual B 10 Notes...
Page 108: ...SUPERSERVER 6010H Manual C 2 Notes...