2-10
SUPERSERVER 2027PR-DNCR/DNCFR/DNCTR USER'S MANUAL
2-6 Checking the Serverboard Setup
After you install the 2027PR-DNCR/DNCFR/DNCTR server in the rack, you will
need to open the unit to make sure the serverboard is properly installed and all the
connections have been made.
Before operating the SC217 chassis for the fi rst time, it is important to remove the
protective fi lm covering the top of the chassis, in order to allow for proper ventilation
and cooling.
Removing the Chassis Cover and Protective Film (Figure 2-7)
1. Uplug the AC power cord from any external power source.
2. Remove the two screws which secure the top cover onto the chassis as
shown above.
3. Lift the top cover up and off the chassis.
4. Peel off the protective fi lm covering the top cover and the top of the chassis
5. Check that all ventilation openings on the top cover and the top of the chassis
are clear and unobstructed.
6. Replace the chassis cover and reconnect the AC power cord.
Caution: Except for short periods of time, do NOT operate the server without
the cover in place. The chassis cover must be in place to allow proper airfl ow
and prevent overheating.
Figure 2-7. Accessing the Inside of the System
Remove
two screws
Check Ventilation
Openings
1
3
1
4
1
5
1
2
Summary of Contents for Supero SUPERSERVER 2027PR-DNCFR
Page 1: ...SUPERSERVER 2027PR DNCR 2027PR DNCFR 2027PR DNCTR SUPER USER S MANUAL Revision 1 0...
Page 5: ...v SUPERSERVER 2027PR DNCR DNCFR DNCTR USER S MANUAL Notes...
Page 10: ...x Notes SUPERSERVER 2027PR DNCR DNCFR DNCTR USER S MANUAL...
Page 34: ...SUPERSERVER 2027PR DNCR DNCFR DNCTR USER S MANUAL 3 4 Notes...
Page 84: ...5 30 SUPERSERVER 2027PR DNCR DNCFR DNCTR USER S MANUAL Notes...
Page 102: ...6 18 SUPERSERVER 2027PR DNCR DNCFR DNCTR USER S MANUAL Notes...
Page 140: ...A 2 SUPERSERVER 2027PR DNCR DNCFR DNCTR USER S MANUAL Notes...