29
Chapter 3: Maintenance and Component Installation
10. Secure the screws in the order 1-2-3, tightening each to 16.1 kgf-cm (14 lbf-in) of
torque using a Torx T20 driver. The Force Frame secures both the Rail Frame and CPU
Package.
Caution
: The screw tightening sequence of 1-2-3 must be executed in the proper sequence
to avoid catasrophic damage to the socket or CPU package.
Figure 3-9. The Force Frame Secured
Figure 3-8. Securing the Force Frame
Screw 1
Screw 3
Screw 2