Superior MHW36CB Additional Instructions Download Page 6

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

6

A

1

C

1

B

1

B

2

C

2

A

2

A

1

C

1

B

1

B

2

C

2

A

2

Chimney

Section

Joints

No. 8 x 1/2" SMS

tA 

der

iu

qe

R s

wer

cS

'6 t

sa

P t

nio

J y

re

vE

nI 

der

iu

qe

R s

wer

cS 

oN

te

sff

O f

o '

6 t

sri

F r

oF 

stni

oJ

4'

6'

Figure 18

Figure 19

FTF8 OFFSET ELEVATION CHART

A

Offset

(inches)

B

Offset

(inches)

FTF8-S4

Stabilizer

Number of FTF8 Chimney Sections

A

Offset

(meters)

B

Offset

(meters)

12"

18"

24"

36"

48"

4

15

0

0

0

0

0

0.10

0.40

9

24

1

0

0

0

0

0.23

0.63

12

29

0

1

0

0

0

0.31

0.76

14

33

2

0

0

0

0

0.36

0.85

15

35

0

0

1

0

0

0.38

0.89

17

38

1

1

0

0

0

0.44

0.98

20

43

0

2

0

0

0

0.51

1.11

21

45

0

0

0

1

0

0.54

1.15

22

47

2

1

0

0

0

0.57

1.21

23

49

0

1

1

0

0

0.59

1.25

25

52

1

2

0

0

0

0.64

1.34

27

55

0

0

0

0

1

0.69

1.42

28

57

1

1

1

0

0

0.72

1.47

29

59

0

1

0

1

0

0.74

1.51

31

63

0

2

1

0

0

0.80

1.60

32

64

0

0

1

1

0

0.82

1.64

33

66

2

1

1

0

0

0.85

1.70

35

69

0

1

0

0

1

0.90

1.77

36

72

2

0

2

0

0

0.93

1.83

38

75

0

0

0

2

0

0.97

1.91

40

78

0

1

1

1

0

1.03

2.00

42

82

0

2

2

0

0

1.08

2.09

44

85

0

0

0

1

1

1.12

2.17

46

89

0

1

0

2

0

1.18

2.26

50

95

0

0

0

0

2

1.28

2.43

52

99

0

1

0

1

1

1.33

2.53

55

104

0

0

1

1

1

1.41

2.66

58

109

0

1

0

0

2

1.48

2.79

61

115

0

0

0

2

1

1.56

2.92

63

118

0

1

1

1

1

1.61

3.02

68

128

1

0

0

0

1

2

1.75

3.25

71

131

1

0

1

0

2

1

1.80

3.35

74

138

1

0

0

0

0

3

1.90

3.52

77

142

1

0

1

0

1

2

1.96

3.61

80

147

1

0

0

1

1

2

2.03

3.74

83

152

1

0

1

0

0

3

2.11

3.88

86

157

1

0

0

0

2

2

2.18

4.01

88

161

1

0

1

1

1

2

2.24

4.10

92

168

1

0

0

0

1

3

2.34

4.27

94

171

1

0

1

0

2

2

2.39

4.36

98

178

1

0

0

0

0

4

2.49

4.54

100

182

1

0

1

0

1

3

2.54

4.63

103

187

1

0

0

1

1

3

2.62

4.76

106

192

1

0

1

0

0

4

2.70

4.89

109

197

1

0

0

0

2

3

2.77

5.02

115

208

1

0

0

0

1

4

2.92

5.29

121

218

1

0

0

0

0

5

3.08

5.55

Table 4

Summary of Contents for MHW36CB

Page 1: ...framing dimensions at Ceilings and Roofs Figure 4 Nail permanently using at least two 2 more fasteners after chimney sections have been assembledthroughthethimble firestopspacer combination and after...

Page 2: ...ceed 30 Chimney heights above 30 must be sup ported by a Model FTF8 S4 stabilizer installed at 30 intervals Note The Model FTF8 S4 adds 3 net effective height to the total chimney system Install the M...

Page 3: ...on can take place Step 9 FTF locking bands Model FLB may be required if the chimney extends too high above theroofflashing Asageneralrule ifthechimney extendsmorethan6 abovetheroofflashing the use of...

Page 4: ...pipe exceed10 betweenelbows achimneystabilizer must be used at the midpoint see Figure 17 The stabilizer support straps must be attached under tension in shear to structural framing members above Whe...

Page 5: ...38 7 3 4 1 0 0 1 9 1 11 78 465 1 2 38 9 1 2 0 0 0 0 10 1 11 82 469 3 4 39 1 3 4 0 1 0 1 9 1 11 93 475 3 4 39 7 3 4 1 0 0 0 10 1 12 08 481 3 4 40 1 3 4 0 1 0 0 10 1 12 24 486 40 6 1 0 1 1 9 1 12 34 He...

Page 6: ...0 0 0 72 1 47 29 59 0 1 0 1 0 0 74 1 51 31 63 0 2 1 0 0 0 80 1 60 32 64 0 0 1 1 0 0 82 1 64 33 66 2 1 1 0 0 0 85 1 70 35 69 0 1 0 0 1 0 90 1 77 36 72 2 0 2 0 0 0 93 1 83 38 75 0 0 0 2 0 0 97 1 91 40...

Page 7: ...stance where chimney is to pass through the first ceiling dimension A To find this point on your ceiling first determine the center point for a vertical chimney following the instructions for vertical...

Page 8: ...8FS 2 Firestop Spacer Flat 12 Pack 94L76 F8FS 12 Firestop Spacer 30 63L30 F8FS30 Firestop Spacer 30 63L32 F8FS30 2 Contemporary Termination Round 63L42 FTF8 CTD Contemporary Termination Round Black H2...

Reviews: