background image

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

1

INSTALLING THE CHIMNEY SYSTEM

Step 1.

  Before continuing, check the operation 

of the damper, as described on 

Page 4

, (

refer 

to 

Figure 2

)

 of the 

Installation Instruction and 

Care and Operations (IICO)

 manual.

Step 3.

 Position appropriate thimble/firestop 

spacer combination at ceiling and nail temporar-

ily with two (2) 8d nails or equivalent fasteners 

(

see 

Figures 3, 4 and 5

).

  Use one fastener on 

opposite sides to hold thimble/firestop spacer 

combination in position. 

In new construction, to determine chimney center 

line, use plumb line from roof or ceiling above 

fireplace to center of flue collar on fireplace.

For remodeling, plumb to center of flue collar 

from ceiling above, drive nail through ceiling 

from below to mark position, then mark and 

cut to passage from above ceiling (around 

nail) (

Figure 1

)

. Then plumb from ceiling or 

roof level directly above hole which has just 

been completed.

       CAUTION 

Allow minimum 1" chimney  

air space to framing members 

throughout chimney installation.  

A minimum 1" air space must be 

maintained from all insulation 

and building materials extend-

ing for any continuous length 

surrounding the chimney.

Reference 

Figures 10 and 11

 in the

 IICO

 and 

their charts for framing dimensions at Ceilings 

and Roofs.

Figure 4

Nail permanently, using at least two (2) more 

fasteners, after chimney sections have been 

assembled through the thimble/firestop spacer 

combination and after any necessary adjust-

ments have been made. Firestop spacer must 

be secured by at least four (4) fasteners when 

completely installed.

Note:

 If there is a room above ceiling level, 

firestop spacer must be installed on the bottom 

side of the ceiling. If an attic is above ceiling 

level, firestop thimble must be installed on the 

bottom side of ceiling joist (

Figure 2

).

Step 2.

  Using standard construction framing 

techniques, construct opening for chimney 

route up through the ceiling(s) and roof or 

through an outside chase.
Framing must maintain adequate minimum air 

space clearance at all times.

Figure 3

Figure 1

Note:  Trim Thimble/

Extension To Desired Length

And Pitch At The Rood Line

14" Min.

Pitched Roof

Pitched Roof

Bow Roof

14" Min.

Outer Pipe Of

Chimney

Outer Pipe Of

Chimney

Outer Pipe Of

Chimney

14" Min.

Thimble

FM8-AT1

13"

Thimble

FM8-AT1

Thimble

FM8-AT1

Thimble

Extension

F8-TE26

Firestop Thimble

Attic Above

1”

Clearance

Minimum

Firestop Spacer

F8FS-2

Room Above

Figure 2

Addendum to Installation Instructions

Additional Instructions for Alternative Chimney 

Installation for Superior™ Round Back Fireplaces with 

Bi-Fold Doors and Combustion Air Kit

P/N 900284-00   Rev. NC   10/2014

For use with Models

MHW36R 

MHW36CB

P900284-00 

Summary of Contents for MHW36CB

Page 1: ...framing dimensions at Ceilings and Roofs Figure 4 Nail permanently using at least two 2 more fasteners after chimney sections have been assembledthroughthethimble firestopspacer combination and after...

Page 2: ...ceed 30 Chimney heights above 30 must be sup ported by a Model FTF8 S4 stabilizer installed at 30 intervals Note The Model FTF8 S4 adds 3 net effective height to the total chimney system Install the M...

Page 3: ...on can take place Step 9 FTF locking bands Model FLB may be required if the chimney extends too high above theroofflashing Asageneralrule ifthechimney extendsmorethan6 abovetheroofflashing the use of...

Page 4: ...pipe exceed10 betweenelbows achimneystabilizer must be used at the midpoint see Figure 17 The stabilizer support straps must be attached under tension in shear to structural framing members above Whe...

Page 5: ...38 7 3 4 1 0 0 1 9 1 11 78 465 1 2 38 9 1 2 0 0 0 0 10 1 11 82 469 3 4 39 1 3 4 0 1 0 1 9 1 11 93 475 3 4 39 7 3 4 1 0 0 0 10 1 12 08 481 3 4 40 1 3 4 0 1 0 0 10 1 12 24 486 40 6 1 0 1 1 9 1 12 34 He...

Page 6: ...0 0 0 72 1 47 29 59 0 1 0 1 0 0 74 1 51 31 63 0 2 1 0 0 0 80 1 60 32 64 0 0 1 1 0 0 82 1 64 33 66 2 1 1 0 0 0 85 1 70 35 69 0 1 0 0 1 0 90 1 77 36 72 2 0 2 0 0 0 93 1 83 38 75 0 0 0 2 0 0 97 1 91 40...

Page 7: ...stance where chimney is to pass through the first ceiling dimension A To find this point on your ceiling first determine the center point for a vertical chimney following the instructions for vertical...

Page 8: ...8FS 2 Firestop Spacer Flat 12 Pack 94L76 F8FS 12 Firestop Spacer 30 63L30 F8FS30 Firestop Spacer 30 63L32 F8FS30 2 Contemporary Termination Round 63L42 FTF8 CTD Contemporary Termination Round Black H2...

Reviews: