Installation
900004-00, 03/2017
Innovative Hearth Products
DRT2000 and DRC2000 Direct-Vent Fireplaces
25
Vertical (Offset) Installation
1. Analyze the vent route and determine the number of vent sections and elbows required
—See
Effective Vent
Length on
Pages 22 and 23
for more information. Plan the venting so that a joint does not occur in the ceiling or
roof joists. Allow for elbows
(
Figure 18
)
. Maintain the minimum clearances for combustibles
(
Page 24
)
.
2. Frame the ceiling opening
—Use a plumb line from the ceiling above the fi replace to locate the center of the
vertical run. Cut and/or frame an opening, 10-1/2 x 10-1/2” (267 x 267 mm) inside dimensions, about this center
mark
(
Figure 20
)
.
Figure 20 - Framing the ceiling opening
Figure 21 - Rear vent gasket
minimum 10 1/2 in.
(267 mm)
minimum 10 1/2 in.
(267 mm)
Roof
Framing
Ceiling
Framing
Plumb Bob
10-1/2” (267 mm) minimum
10-1/2” (267 mm)
minimum
Gasket
3. Install the rear vent gasket
—The rear vent gasket is factory installed and required for all rear vent applications.
If the gasket is missing, position a replacement gasket (contact your local dealer) around the vent collar before
attaching other vent components to the fi replace
(
Figure 21
)
. Loosely attach the gasket with two screws at the
top and bottom.
4. Attach the vent components to the fi replace
—See
Connecting the vent pipe on
Page 22
.
5. Attach the vent components to each other
—See
Connecting the vent pipe on
Page 22
.
6. Install
fi restop/spacer at ceiling
—When using Secure Vent
®
, use SV4.5VF fi restop/spacer at ceiling joists; when
using Secure Flex
®
, use SF4.5VF fi restop/spacer. If there is living space above the ceiling level, the fi restop/
spacer must be installed on the bottom side of the ceiling. If attic space is above the ceiling, the fi restop/spacer
must be installed on the top side of the joist. Route the vent sections through the framed opening and secure the
fi restop/spacer with 8d nails or other appropriate fasteners at each corner.
Remember to maintain 1” (26 mm) clearance to combustibles, framing members, and attic or ceiling insulation
when running vertical chimney sections. The gap between the vent pipe and a vertical fi restop can be sealed with
non-combustible caulking.
NOTE:
Attic insulation shield (H3907) must be installed when blown or loose-fi ll insulation is used, and is
recommended for all attic installations.
7. Support the vertical vent run sections
—Support the vertical portion of the venting system every 8 ft (2.4 m)
above the fi replace vent outlet. One method of support is by utilizing fi eld provided support straps (conventional
plumber’s tape). Secure the plumber’s tape to the framing members with nails or screws. Loop the tape around
the vent, securing the ends of the tape to the framing. If desired, sheet metal screws #6 x 1/2” length may be
used to secure the support straps to the vent pipe
(
Figure 22
)
.
NOTE:
Proper venting support is very important.
Blocking
Support straps
(plumber’s tape)
8 ft (2.4 m)
maximum
1/2” (12.7
mm) minimum
clearance to
combustibles
Figure 22 - Supporting the Vertical Vent Run