Superior Fireplaces VRE4500 Installation And Operation Instruction Manual Download Page 10

SuperiorFireplaces.us.com

127029-01F

10

Figure 7 - Minimum Mantel Clearances for Built-In Installation

Supplied

Firebox Hood

Must Be Used

at All Times

Wire-mesh

Screen

Firebox

Noncombustible

Material May

Project Off this

Surface above

the Firebox Hood

Mantel Shelf

Note: Any portion of the

mantel shelf must NOT

extend beyond this profile.

12" 16" 20"

1

/

2

"

3

/

4

"

12"

Note: All vertical

measurements are

from top of fireplace

hood opening to

bottom of mantel shelf.

These minimum

clearances replace any

other recommended

clearances supplied

with your ANSI Z21.11.2

approved gas logs.

Wall board or facing

material (above

firebox) may be of

combustible material,

including decorative

mantel ornaments or

other similar projec-

tions off of the facing

material.

Framing

Material

INSTALLATION  

continued

Mantel Clearances for Built-In Installation

If placing custom mantel above built-in firebox, you must meet 

the minimum allowable clearance between mantel shelf and top of 

firebox opening shown in 

Figure 7

. These are the minimum allow-

able mantel clearances for a safe installation. Use larger clearances 

wherever possible to minimize the heating of objects and materials 

placed on the mantel.

 CAUTION: Do not allow the vent-free gas log heater 

to touch or extend beyond the fireplace screen.

NOTICE: Surface temperatures of adjacent walls and 

mantels become hot during operation. Walls and 

mantels above the firebox may become hot to the 

touch. If installed properly, these temperatures meet 

the requirement of the national product standard. Fol-

low all minimum clearances shown in this manual.

NOTICE: If your installation does not meet the minimum 

clearances shown, you must do one of the following:

• raise the mantel to an acceptable height

• remove the mantel

BUILT-IN FIREBOX INSTALLATION

Built-in installation of this firebox involves installing firebox into a 

framed-in enclosure. This makes the front of firebox flush with wall. If 

installing a mantel above the firebox, you must follow the clearances 

shown in 

Figure 7

. Follow these instructions to install the firebox in 

this manner.
1.  Frame in rough opening. The firebox framing should be constructed 

of 2 x 4 lumber or heavier. Use dimensions and rough opening layout 

in 

Figure 8

. Adjust framing so that firebox flushes with finished 

wall surface. If installing in a corner, use dimensions in 

Figure 9

for rough opening.

2.  Install gas piping to firebox location. See Gas Line Installation on 

Page 13

 and Connecting to Gas Supply in log set owner’s manual.

Figure 8 - Framing Dimensions

Maintain 1-

1

/

2

"

Clearance at Sides 

and Back of Fireplace

61

(36

"

 Models) 

65

(42

"

 Models)

71

(50

"

 Models)

86-

1

/

2

(36

"

 Models) 

92

"     

(42

"

 Models)

100

"   

(50

"

 Models)

1-

1

/

2

Clearance 

Not Required at

Nailing Flanges 

Figure 9 - Corner Installation

54-

5

/

8

"

30-

1

/

8

"

28-

1

/

4

"

(36

Models)

45-

3

/

8

" (36

Models)

51-

3

/

8

" (42

Models)

59-

3

/

8

" (50

Models)

3.  Carefully set firebox in front of rough opening with back of firebox 

inside wall opening.

4.  Carefully insert firebox into rough opening.
5.  Attach firebox to wall studs using nails or wood screws through 

holes in nailing flange 

(see

 Figure 10, Page 11

).

6.  Install and properly test gas log heater. Follow installation in-

structions included with the vent-free gas log heater that is being 

installed.

Summary of Contents for VRE4500

Page 1: ...N 127029 01 REV F 01 2019 Report No F09 130 PFS US C Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT TO DO IF YOU SMELL GAS Do n...

Page 2: ...ck which is known totheStateofCaliforniatocausecancer andCarbon Monoxide which is known to the State of California tocausebirthdefectsorotherreproductiveharm For more information go to www P65Warnings...

Page 3: ...appliances are approved for installation in the US state of Massachusetts if the following additional requirements are met Un vented Room Heaters shall be installed in accordance with 527 CMR 30 Insta...

Page 4: ...F 4 PRODUCT SPECIFICATIONS 36 MODELS Figure 1 36 Models VRE4536RS VRE4536WS VRE4536RH and VRE4536WH 20 1 4 Ref 1 1 4 22 1 2 19 36 HEARTH 29 30 1 2 30 36 54 1 2 11 1 8 45 1 8 36 3 8 35 1 4 9 1 2 3 3 8...

Page 5: ...RODUCT SPECIFICATIONS continued 42 MODELS Figure 2 42 Models VRE4542RS VRE4542WS VRE4542RH and VRE4542WH 42 HEARTH 21 3 4 8 3 4 3 3 8 9 1 2 26 3 8 41 3 8 4 7 8 1 1 4 3 3 4 32 3 8 36 3 8 11 1 8 7 7 8 5...

Page 6: ...6 Figure 3 50 Models VRE4550RS VRE4550WS VRE4550RH and VRE4550WH 21 3 4 8 3 4 9 1 2 3 3 8 13 50 50 7 30 34 3 8 38 3 8 4 7 8 49 3 8 36 3 8 59 1 8 54 1 2 11 1 8 3 3 4 32 3 8 7 7 8 23 Ref 50 HEARTH PRODU...

Page 7: ...x Location Confined and Unconfined Space The National Fuel Gas Code ANSI Z223 1 NFPA54 allows two meth ods for determining whether the space in which the heater is being installed is confined or uncon...

Page 8: ...ned space When ventilating to an adjoining unconfined space you must provide two permanent openings one within 12 of the ceiling and one within 12 of the floor on the wall connecting the two spaces se...

Page 9: ...ottom of your firebox except where standoff spacers are integrally attached If standoff spacers are attached to your firebox these spacers can be placed directly against wall or framing materials Use...

Page 10: ...ational product standard Fol low all minimum clearances shown in this manual NOTICE Ifyourinstallationdoesnotmeettheminimum clearances shown you must do one of the following raise the mantel to an acc...

Page 11: ...es This firebox may be installed using a cabinet mantel against a wall in your home The firebox and cabinet mantel can be installed directly on the floor Mantels may be available from your retailer or...

Page 12: ...he right and left refractory panels with the gas line knock outs orientated down toward the bottom refractory Align the left and right panels with the rear panel so the grout lines line up 5 Install t...

Page 13: ...l furnace cement Install the gas appliance or cap off gas line if desired A gas line or gas log lighter may be installed for the purpose of installing a vent free decorative gas appliance incorporatin...

Page 14: ...1 20 1 19 5 14 15 16 13 12 11 9 7 6 8 17 2 12 18 4 PARTS MODEL NO CAT NO INTERIOR VRE4536WS F0474 White Stacked VRE4536WH F0476 White Herringbone VRE4542WS F0478 White Stacked VRE4542WH F0480 White He...

Page 15: ...EPLACE 36 1 RP110454 02 TOP FIREPLACE 42 1 RP110454 01 TOP FIREPLACE 50 1 9 J6997 SPACER FIREPLACE TOP 42MC 4 10 FIREPLACE SURROUND ASSEMBLY 1 11 J4362 SPACER CLEARANCE 36 42 50 6 12 J5329 BRACKET F P...

Page 16: ...itute materials not approved by IHP Use of non approved parts can result in poor performance and safety hazards 1 2 5 3 4 6 6 IMPORTANT Installation of brick panels should be done after the fireplace...

Page 17: ...ORY HEARTH 36 STD WHITE 1 REFRACTORY HEARTH 42 STK WHITE 1 REFRACTORY HEARTH 50 STK WHITE 1 3 REFRACTORY RIGHT 36 STK WHITE 1 REFRACTORY RIGHT 36 HER WHITE 1 REFRACTORY RT 42 STK WHITE 1 REFRACTORY RT...

Page 18: ...ler Parts will be shipped at prevailing prices at time of order When ordering repair parts always give the following information 1 The model number of the fireplace 2 The serial number of the fireplac...

Page 19: ...natural or propane gas only Burning conventional fuels such as wood coal or any other solid fuel will cause damage to the Product will produce excessive temperatures and could result in a fire hazard...

Page 20: ...ributor for fireplace code information Printed in U S A 2014 Innovative Hearth Products P N 127029 01 Rev F 01 2019 1769 East Lawrence Street Russellville AL 35654 SuperiorFireplaces us com Record the...

Reviews: