Notice d'utilisation parachute
| FLUID
LIGHT
SUPAIR
|
FLUID
LIGHT
| page 15
Check the completed installation during a hang-test.
The hang-test must happen with the harness completely equiped. If your harness comes with a removable protection, it should be installed before
the test extraction.
Have the installation checked by a professional outfit.
Conduct an extraction test every six ( 6 ) months to ensure proper system functionality.
Note : conducting a hang-test extraction does not imply deploying the reserve parachute which will stay inside its POD.
>> Installing the parachute in its container (individual or tandem).
Weather you have an outer front container or an integrated reserve parachute pocket in your harness, proceed with the installation according to the
manufacturer’s guidelines.
Advise :
In order to guaranty a quick opening speed and a sound structural integrity, your reserve parachute must be repacked every six months.
Take advantage of the repacking procedure to conduct a hang-test extraction.
Reserve parachute folding and installation inside the harness must conform to the specific
guidelines found in this manual.
Connecting the reserve parachute to the harness