Focus on customized architectural lighting                                  

 

wwww.suntechleds.com               [email protected] 

   

Frame installation method 1 :

 

 

 

 
 
 
 
 

 

 

 

 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 

installation carrier drilling: 

Drill a hole in the position where the 
carrier is required to be drilled by 
selecting a suitable drill bit; 

 

Install the expansion screw: 

Use a suitable expansion screw to 
knock the expansion screw into the hole 
drilled in the mounting carrier; 

mounting profile cover:

 

The top cover of the frame with the 
light source installed is aligned with 
the mounting base and fastened to 
the profile mounting base; 

 

mounting frame mounting base: 

Remove the nut and gasket of the 
installed expansion screw, and align 
the hole of the frame base with the 
expansion screw and attach it to the 
installation carrier; 

 

fixed frame mounting base:

 

After installing the upper frame base, 
install and tighten the gasket and nut of 
the expansion screw, and do not loosen 
it; 

mounting profile reinforcement screws:

 

After installing the upper cover of the profile, 
use two self-tapping screws from the lower 
side to fix the profile upper cover and the 
profile mounting base to prevent the profile 
cover from falling. 

 

Summary of Contents for 040 Pixel light

Page 1: ...ce the light string is connected by the national standard flexible cable which can be bent and deformed at will and supports the installation of special shaped façade The product spacing and color can be customized it is suitable for large area display or lighting of building facades bridges and skylights Features New generation dual channel real time backup control protocol Standard DMX512 Contro...

Page 2: ... 2 Standard ball cover measurement 3 Diamond ball cover measurement Frame installation with standard ball cover measurement Base installation with standard ball cover measurement Frame installation with diamond ball cover measurement Base installation with diamond ball cover measurement ...

Page 3: ...0cd CA040 04AE 4 PCS 3535 RGB W DMX512 15V 0 9W 10cd CA040 04XT 4 PCS 5050 RGBW TTL 15V 1 2W 16cd CA040 04XD 4 PCS 5050 RGBW DMX512 15V 1 2W 16cd CA040 04CN 4 PCS 2835 W No control 15V 0 9W 20cd Basic parameters Color gray RGB W each 4096 grayscale RGB W each 65536 grayscale RGB W each 256 grayscale Light source 3535 5050 2835 LED quantities 3pcs 4pcs 6pcs 9pcs Material Flame retardant PC Cover ma...

Page 4: ...BW DMX512 24V 1 9W 24cd CA040 06XD 2 6 PCS 3535 RGBW DMX512 36V 2 2W 24cd CA040 06CN 6 PCS 2835 W No control 24V 1 44W 30cd CA040 09ZD 6 3PCS 3535 2835 RGBW DMX512 24V 1 9W 20cd Mounting parts dimensions Support single mounting parts by screw fixing wire fixing support frame installation Commonly used wire accessories The first frame installation dimension drawing unit mm PC single mounting base s...

Page 5: ...int light source is stuck into the PC mounting base installation is completed Schematic diagram after installation is complete Pixel light installation After the PC mounting base is fixed the point light source is stuck into the PC mounting base adjustment pitch After the installation is completed the pixel light pitch can be fine tuned to ensure that the point source is installed neatly schematic...

Page 6: ...nstalled is aligned with the mounting base and fastened to the profile mounting base mounting frame mounting base Remove the nut and gasket of the installed expansion screw and align the hole of the frame base with the expansion screw and attach it to the installation carrier fixed frame mounting base After installing the upper frame base install and tighten the gasket and nut of the expansion scr...

Page 7: ...le position on the mounting profile and drill the hole on the carrier with a suitable drill bit Install the carrier with expansion rubber plug Knock the expansion rubber plug into the drilled hole of the carrier with a hammer Note the rubber plug should not be loose installation profiles Align the hole on the top cover of the profile with the screw hole and attach it to the mounting carrier fixed ...

Page 8: ...AT5 twisted cables the maximum distance of each section is less than 120 meters the maximum transmission distance between the sub controller and the signal adaptor is less than 120 meters In this case the maximum distance from the signal adaptor to the first pixel light is no more than 2 meters 4 It is recommended that the maximum point spacing should not exceed 2 5 meters and each intermediate po...

Page 9: ... an electric shock or damaging the lamp 4 When the external power cord is connected the corresponding measures of waterproofing and water leakage must be taken 5 The male and female waterproof protective covers for the products shall not be removed before the products are installed and connected 6 Quality Assurance Under normal conditions of use quality assurance is based on the proper storage ins...