background image

ECCO SG04LP1 | User Manual

53

For stability, all the batteries need to be connected in parallel. It is recommended a minimum cable size of 

50mm

2

 diameter with fuse isolators to each inverter. 

Each invert will require a fuse isolator with surge protection and each group circuit will require an RCD. If 

the batteries as supplying power to the main load during the outage then a change over switch will also be 
required or a split load can be used.

 

ƒ

The CT coils used to limit export power must only be connected to the master. Therefore, if six inverters 

are paralleled, three CT coils will be required.

 

ƒ

Connect a RJ45 communication cable between each inverter; the order is not important since both sock

-

ets are the same, so there is no IN or OUT.

 

ƒ

Each phase must only have one master and the others set to slave.

 

ƒ

Each inverter must have a unique Modbus number.

 

ƒ

The maximum length of the communication cables is 2 meters (do not exceed this value)

 

ƒ

All batteries must be connected in parallel and the MPPTs must be kept separate.

 

ƒ

IMPORTANT: When configuring inverters in parallel for a single or three-phase, it is important to 
first check firmware versions to be all the same on all inverters. It is strongly recommended to 
request firmware update on all inverters to the latest and the exact same firmware version.

 

ƒ

IMPORTANT: All inverters in a parallel system must have their own isolating load breaker before 
it goes to the parallel breaker to ensure while programming that the load outputs are isolated 
from each other.

 

ƒ

Only once confirmed all inverters are programmed correctly in parallel or three-phase then only the iso

-

lating breakers can be switched on, which then feeds to the main load output breaker where the actual 
parallel or three-phase connection is made that feeds the loads.

 

ƒ

When configuring a three-phase system using three single-phase inverters, one per phase. It is extreme

-

ly important to check phase rotation to be clockwise feeding the inverters and to confirm the output is 

also clockwise on phase rotation.

 

PLEASE NOTE

The cables have two ends, one to be specifically connected to the BMS and the another one 

to be connected to the inverter, do not change it. If the communication is not working cor-

rectly between inverters then errors will show up on the display. In this case, please check all 

settings and data cable.

 

PLEASE NOTE

 

ƒ

All inverters in a parallel system must have its own isolating load breaker before it goes to 

the parallel breaker to ensure while programming that the load outputs is isolated from 

each other.

 

ƒ

The grid input can also be connected in parallel.

 

ƒ

You cannot connect the Aux/Gen port in parallel, because this causes a conflict between 

the frequency of the generator and the frequency of the grid.

Summary of Contents for ECCO SUN-3.6K-SG04LP1-EU

Page 1: ...p Industrial Building 171 Wai Yip Street Kwun Tong Kowloon Hong Kong Tel 852 2884 4318 Fax 8522884 4816 www sunsynk com sales sunsynk com USER MANUAL v 7 12 09 22 SUN 3K SG04LP1 24 EU SUN 3K SG04LP1 E...

Page 2: ...efinition 17 4 6 Battery Connection 18 4 6 1 Recommended DC Battery Protection 19 4 7 Connecting a Lithium Battery 20 4 8 Battery Temperature Sensor Connection 20 4 9 Connecting the AC 22 4 9 1 Recomm...

Page 3: ...arge Discharge Times 48 5 15 Grid Supply Page 50 5 16 Connecting the DRM s 51 5 17 Advanced Settings for Paralleling Inverters 52 5 18 Solar Power Generated 55 5 19 Grid Power 55 5 20 Advanced Setting...

Page 4: ...ECCO SG04LP1 User Manual 4 APPENDIX A 67 APPENDIX B 68 APPENDIX C 68 APPENDIX D 68 APPENDIX E 69...

Page 5: ...m a physical or mental impairment that would affect their ability to follow this manual install maintain or repair this device Any untrained personnel who might get near this device while it is in ope...

Page 6: ...ce or cleaning to reduce the risk of electri cal shock The unit is not explosion proof so it should not be installed in an explosive atmosphere Never touch electrical components immediately after the...

Page 7: ...rbines Self consumption and feed in to the grid Auto restart while AC is recovering Auto earth bond feature Via a relay CONFIGURABLE Fully programmable controller Programmable supply priority for batt...

Page 8: ...Power On Off Button 2 LCD Display 8 Function Port 14 DC Switch 3 Function Buttons 9 Parallel port 15 PV Input with Two MPPT 4 Battery Input Connectors 10 Generator input 16 Battery 5 RS 485 Port 11 Lo...

Page 9: ...ECCO SG04LP1 User Manual 9 2 1 Product Size...

Page 10: ...es following devices to have a Complete running system Generator or Utility PV modules Consult with your system integrator for other possible system architectures depending on your require ments This...

Page 11: ...ge Range 300 425V PV Input Current 13A 13 13A Max PV Isc 17A 17 17A No of MPPT Strings Per MPPT 1 1 2 1 1 AC Output Data Rated AC Output and UPS Power 3000W 3600W 5000W 6000W Max AC Power 3300W 3690W...

Page 12: ...1 1 RD 1699 C10 11 Safety EMC Standard IEC EN 61000 6 1 2 3 4 IEC EN 62109 1 IEC EN 62109 2 General Data Operating Temperature Range 45 60 C 45 C Derating Cooling Natural Cooling Noise 30dB Communicat...

Page 13: ...SG04LP1 User Manual 13 4 INSTALLATION 4 1 Parts List Check the equipment before installation Please make sure nothing is damaged in the package You should have received the items in the following pac...

Page 14: ...affect the equipment such as sulphuric gas chlorine gas acid or alkali These can cause the copper pipes and brazed joints to corrode and fail to conduct elec tricity reliably Areas that can cause com...

Page 15: ...to the front 4 3 System Diagram ALSO CONSIDER Installing the indoor unit outdoor unit power supply cable transmission cable and remote control cable at least 1 metre away from any television or radio...

Page 16: ...LP1 User Manual 16 WARNING Risk of injury Heavy Object Remember that this inverter is heavy so users must be careful in handling the unit during installation especially when mounting or removing it fr...

Page 17: ...ECCO SG04LP1 User Manual 17 4 5 Function Port Definition...

Page 18: ...battery cable with correct connector which can well t into the battery termi nals 2 Use a suitable screwdriver to unscrew the bolts and t the battery connectors in then fasten the bolt by the screwdr...

Page 19: ...AUTION All wiring connecting must be performed by qualified personnel Before making the final DC con nection or closing the DC Breaker disconnection device ensure the inverter unit is wired correctly...

Page 20: ...nfiguration of master and slave PLEASE NOTE Depending on the battery type the inverter should be capable of controlling the batteries BMS There fore you need to set the protocol of the BMS on both the...

Page 21: ...ECCO SG04LP1 User Manual 21...

Page 22: ...Practices Ensure that suitable disconnection devices and RCDs are fitted Please follow the steps below to implement GRID LOAD and GEN port connections 1 Before making GRID LOAD and GEN port connectio...

Page 23: ...ECCO SG04LP1 User Manual 23 4 9 1 Recommended AC Surge Protector...

Page 24: ...on the main fuse feeding the building and run the cable back to the inverter If using an external meter you can extend the cable for more than 10 metres Plese consult the meter manual on distance Con...

Page 25: ...ermanent earth wire since this can cause faults with an RCD before the inverter Since the inverter is a true hybrid then the bond must only be made when the inverter is operating in Island ing Mode To...

Page 26: ...ECCO SG04LP1 User Manual 26 4 12 Meter Connection 4 12 1 System Connection for the CHNT Meter...

Page 27: ...ECCO SG04LP1 User Manual 27 4 13 Wiring System for Inverter...

Page 28: ...ircuit Voltage Voc of PV modules should be higher than the minimum start voltage of the inverter 4 14 2 PV Module Wiring 1 Switch the Grid Supply Main Switch AC OFF 2 Switch the DC isolator OFF 3 Asse...

Page 29: ...ECCO SG04LP1 User Manual 29 4 Finally insert the DC connector into the positive and negative input of the inverter 4 15 PV Protection...

Page 30: ...ECCO SG04LP1 User Manual 30 4 16 Single Phase Parallel Connection Diagram 03 02 01...

Page 31: ...ECCO SG04LP1 User Manual 31 4 17 Three Phase Parallel Inverter 03 02 01...

Page 32: ...ue of a setting Enter Confirm setting change If not pressed each time the setting will not be saved 5 2 Switching ON OFF Once the inverter has been correctly installed and the batteries have been conn...

Page 33: ...otal daily power into the battery kWh Total daily power out of the battery kWh SOC State of charge of the battery Total daily solar power produced in kWh Total hourly usage of the generator Time Total...

Page 34: ...ing the CT coil Inverter Column Showing inverter total power frequency L1 L2 voltage current and power Load Column Showing total load power load voltage and power on L1 and L2 Battery Column Shows tot...

Page 35: ...the gear icon on the right top of the navigation menu Serial number Software version Time Date and MCU What this page displays What you can do from this page Access the Basic Setup Page press the BAS...

Page 36: ...me Clock To set time click on the BASIC icon and then on Time Time Date AM PM What this page displays Adjust set time Adjust set date Adjust set AM PM What you can do from this page How to set up Touc...

Page 37: ...the Settings click on the gear icon on the right top of the navigation menu 0 0 kWh 0 0 kWh 0 0 kWh 0 0 kWh 0 0 kWh 0 0 kWh 85 BATTERY IN OUT MPPT GRID SOLAR TURBINE AC load Battery Grid Reset status...

Page 38: ...MS Max battery charge current Amps Max battery discharge current Amps should be 20 of the Ah rating for AGM only For Lithium please refer to the battery manufacturer s documentation Note This is a glo...

Page 39: ...n V is for an AGM battery is 57 60V Equalization V for an AGM battery is 58 80V Equalizing charge overcharge to remove sulphate crystals that build up on the plates over time on lead acid batteries Wh...

Page 40: ...ge parameters A generator can either be connected to the Grid side or to the Gen connection When connected to the Grid Input the inverter will consider the power coming from the generator as Grid Supp...

Page 41: ...ECCO SG04LP1 User Manual 41 5 12 Battery Discharge Page To configure inverter s shutdown settings click on the BATTERY icon and then on Shut Down...

Page 42: ...r to enter standby mode It does not entirely shut down the inverter Total shutdown occurs at voltages below 19V The voltage displayed on the Sunsynk Parity Inverter will vary depending on whether the...

Page 43: ...ng on charger set points and decreases the current until the battery is fully charged Float The charging voltage is reduced to between 13 0 VDC and 13 8 VDC and held constant while the current is redu...

Page 44: ...se others PLEASE NOTE With some types of lithium battery the BMS cannot be controlled by the Sunsynk inverter In this case treat the battery as a lead acid type and set the charging and discharging pr...

Page 45: ...RS485 1 Cut Line 3 6 8 FCIFP48100A RS485 1 SSIFP48100A RS485 1 UZ ENERGY UZ EB51 2 100ALL CAN 0 GenixGreen ESS 5120 RS485 6 ESS 10240 RS485 6 ESS BOX2 RS485 6 ESS BOX3 RS485 6 ESS BOX4 RS485 6 Sunwoda...

Page 46: ...ion Single phase Hybrid Inverter Comm version is E41E Single phase Hybrid Inverter Comm version is 1001 E016 48NPFC100 RS485 16 48NPFC150 RS485 16 48NPFC200 RS485 16 Deye SUNB 5 0 C01 48 PC CAN 0 SUNB...

Page 47: ...72 8K HC CAN 0 CANL Pin 8 Blue Nova Rack Series BN52V 840 43 6K BR CAN 0 BlueNova BMAC Manu al v4 pdf BN52V 1120 58 2K BR CAN 0 Blue Nova Rackpower RacPower BN52 100 5 2K BP CAN 0 RacPower BN52 100 5...

Page 48: ...ads Solar Export Set the power limits to supply only the loads connected to the LOAD port Priority to Load Only What you can do from this page Set a real time to start and stop charging or discharging...

Page 49: ...wer both to the Load and Grid ports combined It is set to Low if an over current fault occurs 6 Tick this box if you wish to set the solar panels give power to the Load If you untick this box the sola...

Page 50: ...wer The inverter is connected to the grid but no export is performed The unit allows small amounts of power to flow from the Grid 100W Zero Export Power to prevent any back flow In this example the so...

Page 51: ...ow Set the Maximum Grid Frequency Grid Hz High Set the Minimum Grid Frequency Grid Hz Low Select the correct Grid Type in your local area otherwise the machine will not work or be damaged Select the c...

Page 52: ...h the inverter will be paralleled Set the Modbus SN for paralleling The Sunsynk parity inverter can be wired standalone or where more power is required it can be connected in parallel either single or...

Page 53: ...d the exact same firmware version IMPORTANT All inverters in a parallel system must have their own isolating load breaker before it goes to the parallel breaker to ensure while programming that the lo...

Page 54: ...one inverter in a parallel mode It can damage the inverter Q4 What are the consequences of having more than one Master Inverter or having no inverter set as Master It can damage the inverter There are...

Page 55: ...total solar power produced Access this page by clicking on the Solar Turbine icon on the Home Page 5 19 Grid Power This page shows the Daily Monthly Yearly and total grid power export or consumed Acc...

Page 56: ...maximum current depending on the voltage of the wind turbine Voltage V Max Current A Power W 150 23 33 3500 200 17 50 3500 250 14 00 3500 300 11 67 3500 400 8 75 3500 PLEASE NOTE DO NOT use a wind tu...

Page 57: ...output Most wind turbines are three phase PM type Therefore either a wind turbine controller or a direct connec tion to the MPPT via a simple protection circuit will be required 5 21 Advanced Setting...

Page 58: ...o Export Tick this box to stop exporting power produced by the Aux Load Gen Peak Shaving Tick this box to use peak power shaving 5 22 Advanced Settings for Peak Shaving To configure Peak Power Shaving...

Page 59: ...indicator status displayed on the LCD with as much detail as possible 5 Owner s contact information Error Code Description Solutions F13 Working Mode Change Inverter work mode changed 1 Reset the inv...

Page 60: ...Check if the frequency is in the range of specification 2 You may need to adjust the frequency on the grid set up page F48 DC bus bar voltage is too low Battery low voltage 1 Check if the battery vol...

Page 61: ..._Fault F54 AC_C_InductCurr_DcHigh_Fault F23 Tz_GFCI_OC_Fault F55 DC_VoltHigh_Fault F24 DC_Insulation_Fault F56 DC_VoltLow_Fault F25 DC_Feedback_Fault F57 AC_BackFeed_Fault F26 BusUnbalance_Fault F58 A...

Page 62: ...ECCO SG04LP1 User Manual 62 6 OPERATING MODES 6 1 Mode I Basic 6 2 Mode II With Generator...

Page 63: ...ECCO SG04LP1 User Manual 63 6 3 Mode III With Smart Load 6 4 Mode IV AC Couple...

Page 64: ...ECCO SG04LP1 User Manual 64...

Page 65: ...RCD and earth leakage tests checked that the solar panel Voc voltage does not exceed 480V and checked the battery voltage Power ON Sequence 1 Switch on AC 2 Press Start Button 3 Switch on Battery and...

Page 66: ...s with in the C rating of the battery Too high will damage the battery Check the battery BMS is communicating with the inverter This is the heart of the system this controller everything Ensure you ar...

Page 67: ...environments this may need to be carried out weekly all the cooling fans air ducts are cleaned and dust free Check if there are no fault codes and Lithium battery communication is correct Weekly clean...

Page 68: ...000 for the cable from the switchboard to the IES If an RCD is installed the engineer must 1 Disconnect all live conductors including both active and neutral conductors and 2 Be of the type specified...

Page 69: ...n for the Data Logger please refer to the App User instructions The Data Logger should be connected to the bottom of the inverter via the connection socket marked WIFI For more information training vi...

Page 70: ...Ltd wered by Po...

Reviews: