PRIOR TO LAUNCH
ENSURE ALL COTTER PINS ARE BENT AND SECURE.
•
ALL NUTS ARE TIGHT.
•
HYDRALIC HOSES ARE NEATLY WIRE-TIED TO FRAME AND ARE CLEAR FROM
•
PINCH POINTS.
BATTERY TERMINALS AND ALL FITTINGS ARE TIGHT.
•
RESEVOIR SEAL-CAP IS REMOVED (UNDER BREATHER CAP).
•
ENSURE HYDRAULIC HOSES MARKED RED ARE CONNECTED TO RED QUICK
•
DISCONNECTS IN POWER PACK BOX.
ENSURE HYDRAULIC HOSES MARKED GREEN ARE CONNECTED TO GREEN
•
QUICK DISCONNECTS IN POWER PACK BOX.
ENSURE HYDRAULIC HOSES RUN THROUGH RUBBER GROMMETS IN POWER
•
PACK BOX.
FORM NO.
PAGE 5 OF 15
690249 OPERATION