35
15) Adjusting the hammer position and replacing hammer
A. Loosen the hammer fixing screw
①
and disassemble the hammer
②
or make it loose.
B. Loosen the hammer stopper fixing screw
④
and find a proper place for the hammer. When adjustment is complete, fasten
the fixing screw
④
.
C. Place the hammer
②
closely to the hammer stopper
③
and fasten the hammer fixing screw
①
to fix the hammer
②
.
16) Adjusting the cutter position and replacing the cutter
A. Loosen the cutter holder fixing screw
①
and disassemble the cutter
②
or make it loose.
B. Loosen the cutter stopper fixing screw
④
and find a proper position for the cutter stopper
③
. When adjustment is
complete, fasten the fixing screw
④
.
C. Place the cutter
②
closely to the cutter stopper
③
and fasten the cutter fixing screw
①
to fix the cutter
②
.
[ Fig. 46 ]
①
④
②
③
[ Fig. 47 ]
②
③
④
①
②
②
Summary of Contents for SPS/E-BH-6100 Series
Page 43: ...43 8 8 Table Drawings 1 Basic ...
Page 44: ...44 9 9 Air System Circuit Diagram ...
Page 45: ...45 ...
Page 46: ...46 ...