CHAPTER
Main
Control Box
CHAPTER TEN
MAIN CONTROL BOX
ST PS
Sunrise Training and Education Programmes
1
2
3
4
6
5
To gain access to the main control box the
footboard has to be lifted up as previously
explained.
Unplug the main loom.
Unplug the battery loom.
Unplug the motor/brake loom.
Do not unscrew the two screws visible from
the top of the control box.
The three mounting screws are accessed from
underneath the chassis. These are fixed with
blue thread-lock.
Remove the three screws and lift the control
box off.
26
26
26
26
26
Summary of Contents for Sterling Pearl
Page 42: ......